The Oil Ministry has inked a EGP 1.6 bn agreement with Acwa Power to connect natural gas lines to the company’s Luxor power station,reports the local press. Sources familiar with the matter noted that this represents half the overall cost of establishing a natural gas line that will service the plants’ fuel needs. Once fully operational, the power station is expected to generate 2250 MW.