BP will launch production at the USD 3.8 bn Atoll field in the North Damietta concession ahead of schedule by the end of the year, said Hassan Abady, Chairman BP JV Pharaonic Oil Company, Al Ahram reports. Development of the field is 93% complete, including the drilling of three deepwater wells 950 meters below the water’s surface. The field is expected to produce 300 mcf/d and 8k bbl/d once online.

Tags: