Posted inM&A WATCH

EBRD takes 30% of Hassan Allam’s water platform for up to USD 31 mn

HAU is putting up to USD 61 mn alongside the bank for a platform of 79 coastal plants that sells water to hotels and factories outside the state network

The European Bank for Reconstruction and Development (EBRD) is buying 30% of Hassan Allam Utilities’ (HAU) desalination arm, the company that supplies water to hotels and factories the state does not pipe to. The bank is putting in up to USD 31 mn of equity for the stake in RWD Investments BV, it said in a statement, a little below the USD 32.1 mn its board approved in July. HAU is putting up to USD 61 mn alongside it, which takes the platform’s new equity to USD 92 mn.

That money is going into capacity: RWD plans to add up to 15k cubic meters a day (cbm / d) of desalination every year through 2030 and rebuild older plants so they use less power. From the 96.3k cbm / d it ran at the end of 2025, that pace would come close to doubling the platform by the end of the decade (if you count this year), by our math. A first batch is already moving: the bank lent Ridgewood EGP 350 mn in January 2026 for new small plants and upgrades expected to add 10k-15k cbm / d.

Why it matters: RWD is still a small player nationally, at about 7% of the 1.4 mn cbm / d of desalination capacity the housing ministry counted in October, by our math. And with the state targeting close to 10 mn cbm / d by 2050, there’s plenty of room for it to grow into. HAU is putting up two-thirds of the new equity itself, so what the EBRD’s check mainly brings is a partner whose due diligence other lenders will read and whose presence steadies a bid team in front of a state buyer.

A 27-year-old business

Ridgewood has been around since 1999. Hassan Allam Holding and Abdul Latif Jameel set up a joint venture in 2019 to buy into water assets, the same year the EBRD lent the holding company USD 20 mn to expand into water and wastewater. In 2020, the venture bought the Ridgewood group: 58 plants, with 82.4k cbm / d of capacity. HAU has since bought Almar’s share, so the platform was wholly owned by the group until this transaction; now it’s 70/30.

Day-to-day, the plants run as before. Ridgewood for Water Desalination, the operator inside that platform, runs 79 of them along the coast, in Sinai, Hurghada, Marsa Alam, the North Coast, and Ain Sokhna. It sells to more than 200 hotels, resorts, and factories under build-own-operate and operation-and-maintenance contracts.

What’s next

What changes is the market it can bid into: The Finance Ministry has 16 PPP projects worth USD 3.08 bn in the works — USD 2.68 bn of it in four desalination plants: Suez (USD 1 bn) and Port Said (USD 800 mn), which were cleared for tender in October, and Alamein (USD 170 mn) and Ain Sokhna (USD 710 mn), now in final tendering. EBRD’s disclosure also flags three undisclosed large Category A PPP projects in preparation, to be funded from an uncommitted tranche later.

MEANWHILE- The state’s own plants are going to other operators. In October, the Housing Ministry signed EGP 4.6 bn in operation and maintenance contracts for 11 coastal plants with 485k cbm / d of capacity between them, handing them to San Misr, Proserv, Orascom Construction, a Metito-Orascom consortium, Contrac, and Elsewedy Utilities. RWD is not among them, so for now, its customers are still the ones the network doesn’t reach.