Elsewedy Electric has signed an agreement with Swiss-Swedish power company ABB Group to help it expand the Toshka 2 substation, the local press reports. Elsewedy signed two contracts worth EGP 1.1 bn andEGP 687 mn with the Egyptian Electricity Transmission Company in November to expand the station ahead of installing a 500 kV transmission line linking it to the Benban solar park in Aswan.