Adnoc Onshore has hired Abu Dhabi-based Mannesmann Energy for the second phase of an upgrade at its Northeast Bab oil facilities, according to a press release. The engineering, procurement, and construction (EPC) contract, signed at Adipec earlier this month, covers existing facilities at the Al Nouf and Rumaitha / Shanayel fields. It aims to raise production capacity and reliability while the fields keep producing. Neither company disclosed the contract value, the timeline, or how much extra output the upgrade will add.
Why it matters: Adnoc is targeting 5 mn bbl / d of production capacity by next year, and it’s already running near its current limit. Crude output topped 4.4 mn bbl / d in September, close to maximum capacity, according to IEA figures. Getting more out of existing fields is part of how it closes the gap.
REMEMBER- Adnoc previously awarded a USD 920 mn contract to China’s Jereh Oil & Gas to digitize more than 2k wells across the Bab, Bu Hasa, and Southeast fields under a digitization program slated for completion in 2027.
Deep dive
NMDC Group's dredging arm has won an AED 411.4 mn contract at an Indian greenfield port. The contract, worth about USD 112 mn by our math, covers capital dredging at Machilipatnam Greenfield Port, according to a disclosure (pdf). Megha Engineering and Infrastructures Limited awarded the work which is scheduled to begin in December 2026 and wrap up by September 2027.
It's NMDC's second Indian port commitment in under two years: The Abu Dhabi-based group signed an MoU with India’s Jawaharlal Nehru Port Authority last year for a potential USD 2.4 bn investment in dredging, reclamation, and shore protection works at Vadhvan Port.