Posted inProjects

Iraq is quietly building a way to move oil without ever touching Hormuz

Can a truck route and an unbuilt pipeline do what a strait can’t — ensure that Iraq’s oil keeps moving, no matter what happens at Hormuz? Iraqi fuel oil trucked to Syria’s Baniyas port has started reaching US buyers, Reuters reported last week — cargoes that have been moving since mid-June — and Iraq’s cabinet has since authorized Basra Oil Company to sign an MoU with Syria to convert that same corridor into a pipeline, Iraqi state news agency INA reports.

The caveat? One tanker load beats a month of trucking: More than 600k tons of Iraqi fuel oil reportedly reached Syria by road in June, with Baniyas processing roughly 900 tanker trucks a day. A fleet running at that pace could plausibly move 450k-840k tons a month, transport and logistics specialist Ziya Mammadov tells EnterpriseAM. “The carrying capacity, cost efficiency, and economies of scale offered by tanker vessels simply cannot be replicated by road transport,” Mammadov says.

The corridor was never meant to move oil faster, but rather to buy Iraq time. Its real job is pulling fuel oil out of storage before Iraqi refineries run out of tank space — a pressure valve, not a substitute. Truck queues stretch more than 30 km outside Baniyas — “border processing capacity, truck turnaround times, driver availability, security conditions, and operational coordination would ultimately determine the corridor's practical limits,” Mammadov tells us.

Of everything Iraq has in motion, only one project has an actual price tag and a tender date. Baghdad moved the estimated USD 4.6 bn Basra-Haditha pipeline toward tendering in April, a roughly 2.25 mn bbl / d line running from the southern fields toward western and northern Iraq that could become a common trunk feeding several export branches rather than locking the country into one fixed route.

Downstream of that trunk, nothing is at the same stage of readiness. A Ceyhan extension could tap Turkey's existing corridor and its roughly 1.5 mn bbl / d of nameplate capacity — most of it currently unused — but only once Basra-Haditha physically reaches it. The Baniyas branch has the freshest news behind it — the MoU — reviving a line once designed for around 300k bbl / d, still with no construction award, financing, or timeline attached.

Some of Iraq’s hedges aren’t about avoiding Hormuz at all — just about who’s on the hook while still using it. TotalEnergies has been offering Basrah Medium and Basrah Heavy to Asian refiners on delivered terms, chartering VLCCs itself rather than making buyers send vessels into the Gulf. Basra Oil Company contracted Italy’s Micoperi and Turkey’s Esta to build a third offshore export pipeline with capacity of around 2.4 mn bbl / d, including a 61 km offshore section, a 9 km onshore section, two platforms, and a floating export buoy.

Lebanon wants a piece of the Syria branch, too. Lebanon has proposed extending the Syrian corridor with a pipeline branch from Syria into northern Lebanon, which would give Iraqi crude and products access to Tripoli’s storage, export facilities, and a proposed refinery, The National reports. Iraq and Lebanon will set up a joint technical team, but the plan is still at the statement-of-intent stage and hinges on first reviving the wider Iraq-Syria pipeline system. Near term, Iraq could truck products into Tripoli’s existing storage as it does in Syria, though Lebanon’s USD 1.2 bn in unpaid dues from an earlier Iraqi fuel agreement remains a complication.

The bottom line: Iraq is not choosing between trucks, delivered cargoes, and pipelines as each measure addresses a different weakness in the country’s export system, and, “in today's geopolitical environment, diversified transport corridors have become an essential component of energy logistics [...] in my opinion, this should be understood as a resilience strategy rather than a replacement strategy,” Mammadov says.