General Electric (GE) completed work on a transformer station that connects Badr City to the national grid,according to Al Borsa. The station carries a capacity of 500 KV and will contribute to the 1,300 km Egypt-Saudi interconnection project. The Badr station will eventually produce 1.5 GW, good for 50% of the city’s power needs.

Tags: