Posted inAlso on Our Radar

Arabian Drilling signs two KJO platforms for up to 15 years + Abu Dhabi lets yachts clear entry at the berth

Arabian Drilling has locked in two offshore platforms with KJO for up to 15 years. The company signed a SAR 1.5 bn contract with Khafji Joint Operations (KJO) to provide and operate two self-propelled offshore service platforms, according to a Tadawul disclosure. The agreement replaces existing contracts for the two platforms. One is committed for 10 years from 4Q 2026 and the other for 15 years from 4Q 2028, which the company says is its longest offshore service platform commitment to date. Its backlog now stands at around SAR 18.5 bn.

Backlog keeps setting records while its net income collapses: A larger SAR 2 bn KJO contract for four jack-up rigs had already lifted the backlog to a then-record SAR 18 bn. Meanwhile, offshore rig suspensions linked to the regional conflict helped drive a 90.6% y-o-y drop in 9M net income to SAR 6.9 mn.

No more port-hopping

Abu Dhabi is bringing border checks to the marina: The Federal Authority for Identity, Citizenship, Customs, and Ports Security (ICP) launched a Floating Port of Entry service allowing visiting foreign yachts to clear entry and security checks at their final berthing locations, according to an ICP announcement. It replaces the previous system, where arriving vessels had to first clear immigration and customs at a designated port — Mina Zayed, Khalifa Port, or Mugharaq Port — before moving to a marina. A yacht’s shipping agent now requests an inspection in advance, and ICP teams come to the berth with handheld devices to verify biometrics and travel documents.

REMEMBER- This is the second cut to yacht paperwork this year. Abu Dhabi and Dubai introduced a single sailing permit in January allowing foreign yachts to move between the two emirates. Dubai also introduced a pre-arrival inspection service last year, allowing yacht owners to secure necessary permits before arriving in its waters.