Acwa Power, Luberef, MBC, and more report 1Q 2026 earnings
Acwa Power’s bottom line slip stems from a high 2025 base and local grid limits
Available in your choice of English or Arabic
Acwa Power’s bottom line slip stems from a high 2025 base and local grid limits
Acwa to sign phase two of its 5 GW Turkey renewables agreement at COP31
ALSO- The subscription window for Kesay Clinics’ Nomu IPO opens today
At the center is a SAR 7.5 bn redevelopment of Aleppo International Airport
The agreement locks in a 25-year build-operate-transfer contract
The Philippines represents a high-stakes entry into the Southeast Asian market
PLUS: Four Seasons joins Diriyah’s growing roster of luxury hotels
The agreement covers the full stack of design, construction, financing, ownership, operation, and maintenance of the reverse-osmosis desalination plant
Something went wrong. Please refresh the page and/or try again.
Queue