{"id":663012,"date":"2025-03-26T00:00:00","date_gmt":"2025-03-26T00:00:00","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/"},"modified":"2025-03-26T00:00:00","modified_gmt":"2025-03-26T00:00:00","slug":"egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/","title":{"rendered":"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place"},"content":{"rendered":"<p style=\"padding:0;margin:0;line-height:1.15;orphans:2;widows:2;text-align:left\"> <strong>Gov\u2019t pauses approvals for solar g<\/strong><strong>rid <\/strong><strong>connections<\/strong><strong>: <\/strong>The Egyptian Electric Utility and Consumer Protection Regulatory Agency (Egyptera) has temporarily halted the acceptance of requests to connect solar power plants to the grid until a regulatory framework for net metering and solar self-consumption is finalized, a government source told EnterpriseAM. Solar energy companies have expressed concern over the suspension, with several sources telling us the decision came out of the blue and wasn\u2019t accompanied by a timeline for resumption.<\/p>\n<p style=\"padding:0;margin:0;line-height:1.15;orphans:2;widows:2;text-align:left\">(<strong>Tap or click the headline above to read this story with all of the links <\/strong>to our background as well as external sources.)<\/p>\n<p style=\"padding:0;margin:0;line-height:1.15;orphans:2;widows:2;text-align:left\"><strong>The regs in the making: <\/strong>The upcoming regulations will include a requirement for storage batteries to constitute 10% of installed capacity, a measure aimed at enhancing added value and aligning Egypt with global solar energy storage trends, the government source said.<\/p>\n<p style=\"padding:0;margin:0;line-height:1.15;orphans:2;widows:2;text-align:left\"><strong>The impact is far-reaching: <\/strong>The suspension has left contracts signed by 270 registered solar companies and other unregistered service providers in limbo, with many already fronting the costs of solar panel imports, Beneshty Solar Chairman Romany Hakeem told us. Most of these imports are for large factories switching to solar energy as part of the state\u2019s renewables push, he said. <\/p>\n<p style=\"padding:0;margin:0;line-height:1.15;orphans:2;widows:2;text-align:left\"><strong>\u201cThis [halt] has caused significant problems for solar energy companies<\/strong>, which have obligations and contracts with customers, including factory owners,\u201d Cairo Solar said in a statement. The company has reportedly received \u201cincreasing complaints\u201d from stakeholders surprised by the move, which it believes could deter private investment and lead to economic losses that are difficult to recoup.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Solar energy companies have expressed concern over the suspension<\/p>\n","protected":false},"author":1,"featured_media":663013,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[769,244,93,72,151],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-663012","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-egyptera","tag-electricity","tag-energy","tag-enterpriseam","tag-renewables","wpautop","entry"],"acf":{"mongo_id":"38679cb7-9a10-4d57-90aa-6fa29b8fb533","order":"10","is_powered_by":false,"story_type":"1","photo_url":"https:\/\/ent.news\/2025\/3\/2086.jpg","photo_position":"above","homepage_title":"","full_issue_title":"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place","related_issue":[662994],"teaser":"Solar energy companies have expressed concern over the suspension","voice_url":"https:\/\/s3.us-east-1.amazonaws.com\/ent.news\/audio\/2025\/3\/.d527f36f-1848-4915-a3a4-2038ceb40f4a.mp3"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Egyptera pauses approvals for solar power plant grid connections until new regulations are in place - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place\" \/>\n<meta property=\"og:description\" content=\"Solar energy companies have expressed concern over the suspension\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-26T00:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place\",\"datePublished\":\"2025-03-26T00:00:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/\"},\"wordCount\":275,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1\",\"keywords\":[\"Egyptera\",\"electricity\",\"energy\",\"EnterpriseAM\",\"renewables\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/\",\"name\":\"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1\",\"datePublished\":\"2025-03-26T00:00:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/","og_locale":"en_US","og_type":"article","og_title":"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place","og_description":"Solar energy companies have expressed concern over the suspension","og_url":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2025-03-26T00:00:00+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place","datePublished":"2025-03-26T00:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/"},"wordCount":275,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1","keywords":["Egyptera","electricity","energy","EnterpriseAM","renewables"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/","url":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/","name":"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1","datePublished":"2025-03-26T00:00:00+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2025\/03\/26\/egyptera-pauses-approvals-for-solar-power-plant-grid-connections-until-new-regulations-are-in-place\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Egyptera pauses approvals for solar power plant grid connections until new regulations are in place"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2025\/3\/2086.jpg?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":649123,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/04\/23\/as-funding-flows-into-solar-power-projects-egyptera-considers-permanent-license-for-fit-projects\/","url_meta":{"origin":663012,"position":0},"title":"As funding flows into solar power projects, Egyptera considers permanent license for FiT projects","author":"enterpriseam admin","date":"23 April 2017","format":false,"excerpt":"International finance institutions, including the EBRD, IFC, and African Development Bank, agreed to preliminary funding approvals worth USD 400-800 mn for feed-in tariff (FiT) phase two projects, sources tell Al Borsa. The Arab Fund for Economic and Social Development will also provide USD 85 mn for a 50 MW solar\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":543462,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/02\/solar-plants-face-new-grid-integration-fees\/","url_meta":{"origin":663012,"position":1},"title":"Solar plants face new grid integration fees","author":"enterpriseam admin","date":"2 February 2022","format":false,"excerpt":"Solar plants are facing more new charges: Solar plants producing more than 500 KW of power will be required to pay fees to the Electricity Ministry to help defray the costs of connecting to the national grid \u2014 a move that industry players say represents a threat to Egypt\u2019s nascent\u2026","rel":"","context":"In &quot;Green economy&quot;","block_context":{"text":"Green economy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/green-economy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/20.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":637368,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/11\/14\/egyptera-renews-electricity-distribution-production-licenses-to-10-companies\/","url_meta":{"origin":663012,"position":2},"title":"Egyptera renews electricity distribution, production licenses to 10 companies","author":"enterpriseam admin","date":"14 November 2017","format":false,"excerpt":"The Egyptian Electric Utility & Consumer Protection Regulatory Agency (Egyptera) has renewed electricity distribution and production licenses for 10 companies, sources from the agency tell Al Borsa. The companies include TCI Sanmar, Majid Al Futtaim Properties, and Emaar Misr. Egyptera also approved granting FAS Energy and Alef Solar, which are\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":579175,"url":"https:\/\/enterpriseam.com\/egypt\/2023\/01\/29\/egyptair-not-for-sale-small-scale-solar-projects-get-a-break\/","url_meta":{"origin":663012,"position":3},"title":"EgyptAir not for sale + small-scale solar projects get a break","author":"enterpriseam admin","date":"29 January 2023","format":false,"excerpt":"AVIATION + PRIVATIZATION-EgyptAir isn\u2019t up for sale: The government has no plans to sell the national flag carrier, the cabinet said in a statement in response to rumors circulating on social media and some media outlets last week.ENERGY- More solar producers exempted from integration fees: The Egyptian Electric Utility and\u2026","rel":"","context":"In &quot;Also on our Radar&quot;","block_context":{"text":"Also on our Radar","link":"https:\/\/enterpriseam.com\/egypt\/category\/also-on-our-radar\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2023\/1\/483.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":622782,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/10\/11\/egypt-to-fine-saudis-fas-for-delay-in-benban-solar-energy-project\/","url_meta":{"origin":663012,"position":4},"title":"Egypt to fine Saudi\u2019s Fas for delay in Benban solar energy project","author":"enterpriseam admin","date":"11 October 2018","format":false,"excerpt":"The Egyptian Electric Utility & Consumer Protection Regulatory Agency (Egyptera) has decided to fine Fas Energy, a subsidiary of Saudi Arabia\u2019s Al Hokair Group, for a delay in completing a 50 MW solar power plant in Benban under phase one of the feed-in tariff program, sources close to the matter\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":647273,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/07\/egyptera-grants-infinity-25-year-energy-production-license\/","url_meta":{"origin":663012,"position":5},"title":"Egyptera grants Infinity 25-year energy production license","author":"enterpriseam admin","date":"7 May 2017","format":false,"excerpt":"The Egyptian Electric Utility and Consumer Protection Agency\u2019s (Egyptera) board of directors approved granting Infinity Solar a 25-year energy production license, Al Borsa reports. The board also approved granting five unnamed solar power companies temporary one-year licenses for energy production under the feed-in tariff program. The companies will be granted\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/663012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=663012"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/663012\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/662994"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media\/663013"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=663012"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=663012"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=663012"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=663012"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=663012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}