{"id":649954,"date":"2017-03-13T04:11:47","date_gmt":"2017-03-13T04:11:47","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/"},"modified":"2017-03-13T04:11:47","modified_gmt":"2017-03-13T04:11:47","slug":"electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/","title":{"rendered":"Electricity Ministry to bring new power lines and water-powered station online by September"},"content":{"rendered":"<p>The Electricity Ministry will bring some 800 km of power lines and associated distribution infrastructure worth a combined EGP 4 bn by September when Elsewedy Electric and Saudi\u2019s NCC Ltd. complete work in Upper Egypt, a top ministry official <a href=\"http:\/\/www.alborsanews.com\/2017\/03\/12\/991714\">tell Al Borsa<\/a>. The 500 KV lines will run parallel to the main line that runs out of the high dam in Aswan. The Electricity Ministry is currently in talks with the Finance Ministry over additional funding for upgrades to its transmission infrastructure, the source adds, explaining that the Egyptian Electricity Transmission Company has reportedly signed an agreement with China\u2019s State Grid to add 1,120 km of above-ground lines.<\/p>\n<p>Meanwhile, the ministry is due to bring a small 32 MW hydroelectric station online in Asyut next month, <a href=\"http:\/\/www.alborsanews.com\/2017\/03\/12\/991481\">the newspaper ads<\/a>, as part of a plan to modestly expand hydroelectric generation capacity.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Electricity Ministry will bring some 800 km of power lines and associated distribution infrastructure worth a combined EGP 4 bn by September when Elsewedy Electric and Saudi\u2019s NCC Ltd. complete work in Upper Egypt, a top ministry official tell Al Borsa. The 500 KV lines will run parallel to the main line that runs [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[93,72],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-649954","post","type-post","status-publish","format-standard","hentry","category-energy","tag-energy","tag-enterpriseam","wpautop","entry"],"acf":{"mongo_id":"4e2d8be8-1e99-4961-9dc8-daf185482921","order":"0","is_powered_by":true,"section_story_id":"d331b189-faf5-482d-b9cb-a13b56cb35bf","story_type":"1","photo_url":"","photo_position":"above","related_issue":[649926],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Electricity Ministry to bring new power lines and water-powered station online by September - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electricity Ministry to bring new power lines and water-powered station online by September\" \/>\n<meta property=\"og:description\" content=\"The Electricity Ministry will bring some 800 km of power lines and associated distribution infrastructure worth a combined EGP 4 bn by September when Elsewedy Electric and Saudi\u2019s NCC Ltd. complete work in Upper Egypt, a top ministry official tell Al Borsa. The 500 KV lines will run parallel to the main line that runs [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-13T04:11:47+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Electricity Ministry to bring new power lines and water-powered station online by September\",\"datePublished\":\"2017-03-13T04:11:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/\"},\"wordCount\":150,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"energy\",\"EnterpriseAM\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/\",\"name\":\"Electricity Ministry to bring new power lines and water-powered station online by September - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2017-03-13T04:11:47+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electricity Ministry to bring new power lines and water-powered station online by September\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Electricity Ministry to bring new power lines and water-powered station online by September - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/","og_locale":"en_US","og_type":"article","og_title":"Electricity Ministry to bring new power lines and water-powered station online by September","og_description":"The Electricity Ministry will bring some 800 km of power lines and associated distribution infrastructure worth a combined EGP 4 bn by September when Elsewedy Electric and Saudi\u2019s NCC Ltd. complete work in Upper Egypt, a top ministry official tell Al Borsa. The 500 KV lines will run parallel to the main line that runs [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2017-03-13T04:11:47+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Electricity Ministry to bring new power lines and water-powered station online by September","datePublished":"2017-03-13T04:11:47+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/"},"wordCount":150,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["energy","EnterpriseAM"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/","url":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/","name":"Electricity Ministry to bring new power lines and water-powered station online by September - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2017-03-13T04:11:47+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/13\/electricity-ministry-to-bring-new-power-lines-and-water-powered-station-online-by-september\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Electricity Ministry to bring new power lines and water-powered station online by September"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":597467,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/07\/28\/elsewedy-to-complete-power-line-in-egypts-benban-solar-complex-september\/","url_meta":{"origin":649954,"position":0},"title":"Elsewedy to complete power line in Egypt\u2019s Benban solar complex September","author":"enterpriseam admin","date":"28 July 2019","format":false,"excerpt":"Elsewedy Electric will complete in September a 185 km, 500 kV overhead power line to connect Benban 3, a transformer station in Benban\u2019s solar park, to the grid through Naga Hamady in Upper Egypt, sources from the Electricity Ministry told the press. The transmission line, for which Elsewedy signed a\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":647377,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/chinas-state-grid-to-build-1210-km-electricity-transmission-line\/","url_meta":{"origin":649954,"position":1},"title":"China\u2019s State Grid to build 1,210 KM electricity transmission line","author":"enterpriseam admin","date":"9 May 2017","format":false,"excerpt":"Chinese company State Grid is building a 1,210 KM electricity transmission line for the Electricity Ministry, Minister Mohamed Shaker tells Al Mal. The 500 kV line is expected to be completed within a year.","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":573447,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/08\/05\/your-top-infrastructure-stories-of-the-week-15\/","url_meta":{"origin":649954,"position":2},"title":"Your top infrastructure stories of the week","author":"enterpriseam admin","date":"5 August 2020","format":false,"excerpt":"Your top infrastructure stories of the week: The Egyptian Electricity Transmission Company (EETC) signed a EGP 424 mn agreement with Energya Cables to implement a project that will connect the Heliopolis and Obour electricity transformer stations to Al Nahda Station, according to Al Mal.The EETC signed a EGP 143 mn\u2026","rel":"","context":"In \"agriculture\"","block_context":{"text":"agriculture","link":"https:\/\/enterpriseam.com\/egypt\/tag\/agriculture\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":601269,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/02\/24\/electricity-ministry-raises-benbans-solar-park-cost-sharing-bill\/","url_meta":{"origin":649954,"position":3},"title":"Electricity Ministry raises Benban\u2019s solar park cost-sharing bill","author":"enterpriseam admin","date":"24 February 2019","format":false,"excerpt":"The Egyptian Electricity Transmission Company raised the cost-sharing bill of Benban\u2019s solar park developers by about 25%, local press reported. The raise accounts for the increased cost of building materials the cost of control station and central station to be constructed for the park. Under the Feed-in-Tariff program, companies operating\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":625963,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/08\/27\/electricity-ministry-to-launch-tender-for-power-transmission-control-centers-in-cairo-and-alex\/","url_meta":{"origin":649954,"position":4},"title":"Electricity Ministry to launch tender for power transmission control centers in Cairo and Alex","author":"enterpriseam admin","date":"27 August 2018","format":false,"excerpt":"The Electricity Ministry is planning to launch a tender in September for the construction of two power transmission control centers in Cairo and Alexandria worth a combined EGP 1.5 bn, unnamed ministry sources tell Al Mal. Offers from Siemens, Schneider, General Electric, and NR Electric Co, will be given priority,\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":571700,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/05\/20\/your-top-infrastructure-stories-of-the-week-8\/","url_meta":{"origin":649954,"position":5},"title":"Your top infrastructure stories of the week","author":"enterpriseam admin","date":"20 May 2020","format":false,"excerpt":"Your top infrastructure stories of the week: 2Africa project: Telecom Egypt is participating in a project to lay a 37k-km subsea cable between Europe, the Middle East and 16 countries in Africa to expand broadband and mobile networks on the continent. The cable will come online in 2023-2024.Port Said factory:\u2026","rel":"","context":"In \"agriculture\"","block_context":{"text":"agriculture","link":"https:\/\/enterpriseam.com\/egypt\/tag\/agriculture\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/649954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=649954"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/649954\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/649926"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=649954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=649954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=649954"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=649954"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=649954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}