{"id":649898,"date":"2017-03-12T04:13:43","date_gmt":"2017-03-12T04:13:43","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/"},"modified":"2017-03-12T04:13:43","modified_gmt":"2017-03-12T04:13:43","slug":"10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/","title":{"rendered":"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban"},"content":{"rendered":"<p>10 solar power companies must update the feasibility studies for their solar power plants to reflect the change in location from Zaafarana to Benban, as required by their various lenders, <a href=\"http:\/\/www.alborsanews.com\/2017\/03\/09\/990557\">Al Borsa reports.<\/a> These companies \u2014 which include Enara Energy, Zaafarana Solar, Alef Solar, Arena Energy, MID Energy, and Rah Solar \u2014 had requested the transfer to benefit from the government\u2019s cost sharing agreement under the feed-in tariff program. In related news, German companies Ib Vogt and Solizer have reached financial close on a 64.1 MW photovoltaic plant in Egypt in partnership with Infinity Solar, <a href=\"http:\/\/renews.biz\/106206\/germans-soak-up-egyptian-sun\/\">reNews<\/a> reported. The Infinity 50 solar park in Benban secured 85% of the funding from Bayerische Landesbank and the remainder from the Arab African International Bank. Ib Vogt has started construction and aims to commission the facility in the fourth quarter of the year, it said.<\/p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>10 solar power companies must update the feasibility studies for their solar power plants to reflect the change in location from Zaafarana to Benban, as required by their various lenders, Al Borsa reports. These companies \u2014 which include Enara Energy, Zaafarana Solar, Alef Solar, Arena Energy, MID Energy, and Rah Solar \u2014 had requested the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[93,72],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-649898","post","type-post","status-publish","format-standard","hentry","category-energy","tag-energy","tag-enterpriseam","wpautop","entry"],"acf":{"mongo_id":"463adcb3-9c2d-4aeb-bfa1-3cddfa60d8be","order":"0","is_powered_by":true,"story_type":"1","photo_url":"","photo_position":"above","related_issue":[649861],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban\" \/>\n<meta property=\"og:description\" content=\"10 solar power companies must update the feasibility studies for their solar power plants to reflect the change in location from Zaafarana to Benban, as required by their various lenders, Al Borsa reports. These companies \u2014 which include Enara Energy, Zaafarana Solar, Alef Solar, Arena Energy, MID Energy, and Rah Solar \u2014 had requested the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-12T04:13:43+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban\",\"datePublished\":\"2017-03-12T04:13:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/\"},\"wordCount\":152,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"energy\",\"EnterpriseAM\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/\",\"name\":\"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2017-03-12T04:13:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/","og_locale":"en_US","og_type":"article","og_title":"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban","og_description":"10 solar power companies must update the feasibility studies for their solar power plants to reflect the change in location from Zaafarana to Benban, as required by their various lenders, Al Borsa reports. These companies \u2014 which include Enara Energy, Zaafarana Solar, Alef Solar, Arena Energy, MID Energy, and Rah Solar \u2014 had requested the [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2017-03-12T04:13:43+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban","datePublished":"2017-03-12T04:13:43+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/"},"wordCount":152,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["energy","EnterpriseAM"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/","url":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/","name":"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2017-03-12T04:13:43+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/03\/12\/10-solar-power-companies-to-update-feasibility-studies-for-fit-projects-after-relocating-from-zaafarana-to-benban\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"10 solar power companies to update feasibility studies for FiT projects after relocating from Zaafarana to Benban"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":629483,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/31\/25-domestic-intl-companies-express-their-interest-in-50-mw-zaafarana-solar-plant\/","url_meta":{"origin":649898,"position":0},"title":"25 domestic, int\u2019l companies express their interest in 50 MW Zaafarana solar plant","author":"enterpriseam admin","date":"31 May 2018","format":false,"excerpt":"25 domestic and international companies have expressed their interest in bidding on a tender for a 50 MW solar power plant in Zaafarana, New and Renewable Energy Authority (NREA) sources said. The list of potential bidders includes PowerChina, Sterling & Wilson, Infinifity Solar, EDF, Scatec Solar, a First Solar-Elsewedy Electric\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":622976,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/10\/17\/five-qualify-to-bid-for-eur-50-mn-zaafarana-solar-plant\/","url_meta":{"origin":649898,"position":1},"title":"Five qualify to bid for EUR 50 mn Zaafarana solar plant","author":"enterpriseam admin","date":"17 October 2018","format":false,"excerpt":"Five international bidders have qualified to submit financial offers for an EUR 50 mn, 50 MW solar power plant in Zaafarana, sources from the New and Renewable Energy Authority (NREA) said on Monday. The companies \u2014 reportedly Spain-based Elecnor, Germany\u2019s B Electric, Australia-based TCK Solar, India\u2019s Vikram Solar and Chinese\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":651872,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/02\/22\/eetc-asks-solar-power-companies-to-cover-increases-in-infrastructure-development-costs-for-renewable-energy-projects-ready-to-sign-power-purchasing-agreements\/","url_meta":{"origin":649898,"position":2},"title":"EETC asks solar power companies to cover increases in infrastructure development costs for renewable energy projects, ready to sign power purchasing agreements","author":"enterpriseam admin","date":"22 February 2017","format":false,"excerpt":"The Egyptian Electricity Transmission Company (EETC) is ready to sign power purchase agreements with renewable energy companies under the feed-in tariff program as soon as they reach financial close, Al Borsa says. The Finance Ministry approved investors\u2019 letters of guarantee on Tuesday, one day after the EETC informed them during\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":602488,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/03\/28\/infinity-solar-to-complete-four-plants-at-benban-park-by-mid-april\/","url_meta":{"origin":649898,"position":3},"title":"Infinity Solar to complete four plants at Benban park by mid-April","author":"enterpriseam admin","date":"28 March 2019","format":false,"excerpt":"Infinity Solar has completed the construction of three solar plants in Benban solar power park and expects to complete the fourth by mid-April, Al Mal reports. Two of the completed plants have a production capacity of 50 MW apiece, while the third has a production capacity of 30 MW. The\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":641352,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/09\/19\/solar-companies-complain-of-delays-in-infrastructure-development-for-benban-solar-power-complex\/","url_meta":{"origin":649898,"position":4},"title":"Solar companies complain of delays in infrastructure development for Benban solar power complex","author":"enterpriseam admin","date":"19 September 2017","format":false,"excerpt":"Solar power companies developing projects under the second phase of the feed-in tariff program are complaining about the slow pace at which infrastructure is being built for the solar power complex Benban, Aswan, Al Borsa reports. Sources from the companies tell the newspaper that they haven\u2019t seen any work being\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":641029,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/09\/11\/electricity-ministry-to-tender-eur-40-mn-solar-power-plant-in-kom-ombo-this-month\/","url_meta":{"origin":649898,"position":5},"title":"Electricity Ministry to tender EUR 40 mn solar power plant in Kom Ombo this month","author":"enterpriseam admin","date":"11 September 2017","format":false,"excerpt":"The Electricity Ministry plans to issue a global tender this month for the development of a EUR 40 mn, 20 MW solar power plant in Kom Ombo, Aswan, officials tell Al Mal. The plant, Kom Ombo\u2019s first, is being funded by the French Development Agency, which has also allocated EUR\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/649898","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=649898"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/649898\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/649861"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=649898"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=649898"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=649898"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=649898"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=649898"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}