{"id":647359,"date":"2017-05-09T03:25:23","date_gmt":"2017-05-09T03:25:23","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/"},"modified":"2017-05-09T03:25:23","modified_gmt":"2017-05-09T03:25:23","slug":"siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/","title":{"rendered":"Siemens set global record for execution of fast-track power projects in Egypt"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-05\"><\/a> <strong>Siemens has set a new global record for the execution of fast-track power projects by<\/strong><strong>connecting 4.8GW of generation capacity to the Egyptian grid<\/strong>, Julian Turner writes for <a href=\"http:\/\/www.power-technology.com\/features\/featureinside-egypts-record-breaking-energy-megaproject-5806392\/\">Power-technology<\/a>. Turner interviewed Peter Ullrich, project director of the three combined-cycle power plants at Siemens Power & Gas Division, who told him the project \u201csets a new industry benchmark in terms of modern power plant construction \u2014 the connection of 4.8GW of new capacity to the grid in only 18 months, 400MW more than promised.\u201d He says the three plants in Beni Suef, Burullus and the new administrative capital \u2014 two of them built by Orascom Construction and one by Elsewedy Electric \u2014 will be <strong>the largest combined-cycle gas-fired plants ever built and operated. <\/strong>\u201cIn January 2017, 18 months after the signing, we achieved 4.8GW; in short, 10% more generating capacity than originally promised. Never before has the energy system of an entire country been developed so fast,\u201d Ulrich adds.<\/p>\n<p><strong>The higher efficiency of the power plants saves Egypt an estimated USD 1.3 bn in natural <\/strong><strong>gas consumption each year<\/strong> and Ulrich explains that each 1.5% improvement in efficiency reduces each plant\u2019s carbon dioxide emissions by approximately 320,000 tonnes. He says Siemens is also working on Egypt on expanding renewables as a \u201ccombination of high-efficiency combined-cycle power plants and renewable sources are best suited to overcome the power shortages in the country.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Siemens has set a new global record for the execution of fast-track power projects byconnecting 4.8GW of generation capacity to the Egyptian grid, Julian Turner writes for Power-technology. Turner interviewed Peter Ullrich, project director of the three combined-cycle power plants at Siemens Power &#038; Gas Division, who told him the project \u201csets a new industry [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8572],"tags":[72,2380],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-647359","post","type-post","status-publish","format-standard","hentry","category-speed-round","tag-enterpriseam","tag-speed-round","wpautop","entry"],"acf":{"mongo_id":"9ce14cb4-820f-4de0-80ca-1ae871ab844e","order":"0","is_powered_by":true,"section_story_id":"2894817b-97fc-43e0-9f96-334ee8cd47a1","story_type":"1","photo_url":"","photo_position":"above","related_issue":[647347],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Siemens set global record for execution of fast-track power projects in Egypt - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Siemens set global record for execution of fast-track power projects in Egypt\" \/>\n<meta property=\"og:description\" content=\"Siemens has set a new global record for the execution of fast-track power projects byconnecting 4.8GW of generation capacity to the Egyptian grid, Julian Turner writes for Power-technology. Turner interviewed Peter Ullrich, project director of the three combined-cycle power plants at Siemens Power &amp; Gas Division, who told him the project \u201csets a new industry [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2017-05-09T03:25:23+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Siemens set global record for execution of fast-track power projects in Egypt\",\"datePublished\":\"2017-05-09T03:25:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/\"},\"wordCount\":232,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"EnterpriseAM\",\"SPEED ROUND\"],\"articleSection\":[\"Speed Round\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/\",\"name\":\"Siemens set global record for execution of fast-track power projects in Egypt - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2017-05-09T03:25:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Siemens set global record for execution of fast-track power projects in Egypt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Siemens set global record for execution of fast-track power projects in Egypt - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/","og_locale":"en_US","og_type":"article","og_title":"Siemens set global record for execution of fast-track power projects in Egypt","og_description":"Siemens has set a new global record for the execution of fast-track power projects byconnecting 4.8GW of generation capacity to the Egyptian grid, Julian Turner writes for Power-technology. Turner interviewed Peter Ullrich, project director of the three combined-cycle power plants at Siemens Power & Gas Division, who told him the project \u201csets a new industry [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2017-05-09T03:25:23+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Siemens set global record for execution of fast-track power projects in Egypt","datePublished":"2017-05-09T03:25:23+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/"},"wordCount":232,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["EnterpriseAM","SPEED ROUND"],"articleSection":["Speed Round"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/","url":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/","name":"Siemens set global record for execution of fast-track power projects in Egypt - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2017-05-09T03:25:23+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/09\/siemens-set-global-record-for-execution-of-fast-track-power-projects-in-egypt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Siemens set global record for execution of fast-track power projects in Egypt"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":628678,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/10\/oc-achieves-power-to-grid-connection-for-first-of-the-siemens-power-plants\/","url_meta":{"origin":647359,"position":0},"title":"OC achieves power-to-grid connection for first of the Siemens power plants","author":"enterpriseam admin","date":"10 May 2018","format":false,"excerpt":"OC achieves power-to-grid connection for first of the Siemens power plants: Orascom Construction (OC) has completed power-to-grid on all modules of the 4.8 MW Burullus combined cycle power plant \u2014 the first of the three Siemens power plants to reach this stage, the company announced in a statement on Wednesday\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2018\/5\/2290.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":593008,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/14\/actis-engie-datang-in-the-running-to-acquire-stake-in-egypts-combined-cycle-power-plants\/","url_meta":{"origin":647359,"position":1},"title":"Actis, Engie, Datang in the running to acquire stake in Egypt\u2019s combined-cycle power plants","author":"enterpriseam admin","date":"14 November 2019","format":false,"excerpt":"Actis, Engie, Datang in the running to acquire stake in Egypt\u2019s combined-cycle power plants: Actis, France\u2019s Engie, and China Datang Overseas Investment are all competing alongside Blackstone\u2019s Zarou to acquire a stake in the Siemens \/ Orascom Construction \/ Elsewedy Electric combined-cycle power plants, according to Bloomberg. Sources in the\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2017\/3\/970.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":595035,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/15\/egypts-orascom-germanys-siemens-to-rebuild-iraqs-baiji-power-complex\/","url_meta":{"origin":647359,"position":2},"title":"Egypt\u2019s Orascom, Germany\u2019s Siemens to rebuild Iraq\u2019s Baiji power complex","author":"enterpriseam admin","date":"15 September 2019","format":false,"excerpt":"OC-Siemens consortium to rebuild 1.6 GW power plant complex in Iraq\u2019s Baiji: A consortium comprising Orascom Construction (OC) and Siemens has signed an agreement with the Iraqi government to rebuild two gas-powered energy plants in the war-torn city of Baiji, north of Baghdad, OC said in a press release (pdf).\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2019\/9\/2682.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":626831,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/12\/siemens-to-sign-management-contracts-for-the-three-combined-cycle-plants-next-week\/","url_meta":{"origin":647359,"position":3},"title":"Siemens to sign management contracts for the three combined cycle plants next week","author":"enterpriseam admin","date":"12 July 2018","format":false,"excerpt":"Siemens to sign management contracts for the three combined cycle plants next week: It appears that the Electricity Ministry had settled on having Siemens run the day-to-day operations and maintenance of the three combined-cycle power plants in the new capital, Burullus, and Beni Suef. The global giant built the plants\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":627990,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/06\/20\/eehc-in-talks-with-siemens-to-manage-maintain-combined-cycle-power-plants\/","url_meta":{"origin":647359,"position":4},"title":"EEHC in talks with Siemens to manage, maintain combined cycle power plants","author":"enterpriseam admin","date":"20 June 2018","format":false,"excerpt":"EEHC in talks with Siemens to manage, maintain combined cycle power plants: The Egyptian Electricity Holding Company (EEHC) is in talks with Siemens for the day-to-day management and maintenance of the three Siemens combined-cycle power plants in the new capital, Burullus, and Beni Suef, unnamed Electricity Ministry sources tell Al\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":598540,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/05\/28\/edra-and-blackstones-zarou-express-interest-in-operating-siemens-power-plants\/","url_meta":{"origin":647359,"position":5},"title":"Edra and Blackstone\u2019s Zarou express interest in operating Siemens power plants","author":"enterpriseam admin","date":"28 May 2019","format":false,"excerpt":"INVESTMENT WATCH- Blackstone portfolio company and Edra express interest in operating Siemens power plants: Blackstone Group\u2019s Zarou and Malaysian company Edra Power Holdings have both expressed an interest in taking over the operation of the three Siemens-built, combined-cycle power plants inaugurated in July, Electricity Minister Mohamed Shaker told Bloomberg, adding\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2020\/1\/659.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/647359","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=647359"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/647359\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/647347"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=647359"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=647359"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=647359"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=647359"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=647359"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}