{"id":645422,"date":"2017-07-19T03:43:53","date_gmt":"2017-07-19T03:43:53","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/"},"modified":"2017-07-19T03:43:53","modified_gmt":"2017-07-19T03:43:53","slug":"fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/","title":{"rendered":"FiT rates for all subsequent renewable energy projects to be set on a case by case basis"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-07\"><\/a> The Electricity Ministry will not be issuing a set feed-in tariff (FiT) rate for waste-to-energy projects and instead will set the fees on a case-by-case basis, said Electricity Minister Mohamed Shaker. It will make its determination based on the offers investors present, <a href=\"https:\/\/alborsanews.com\/2017\/07\/18\/1038461\">he tells Al Borsa<\/a>. The ministry had initially settled on a FiT of EGP 1.45 per kWh last month, but had received <a href=\"https:\/\/enterprise.press\/stories\/2017\/06\/21\/foreign-companies-submit-proposals-for-waste-to-energy-plants-at-varying-feed-in-tariff-rates\/\">offers from foreign companies at varying rates<\/a>. As for the FiT program for renewable energy, Shaker said that the program would not be extended past phase 2, adding that the ministry will be issuing tenders on all subsequent solar and wind projects with the FiT being set based on the specific project. The move would in theory give the ministry more flexibility in determining the price it will be pay for these projects. Shaker also noted multilateral finance institutions have committed USD 3 bn in funding to phase 2 of the FiT program. In other ministry news, Shaker reminded us that there is still no date by which the Dabaa phantom project will be signed, sealed and delivered.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Electricity Ministry will not be issuing a set feed-in tariff (FiT) rate for waste-to-energy projects and instead will set the fees on a case-by-case basis, said Electricity Minister Mohamed Shaker. It will make its determination based on the offers investors present, he tells Al Borsa. The ministry had initially settled on a FiT of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[93,72],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-645422","post","type-post","status-publish","format-standard","hentry","category-energy","tag-energy","tag-enterpriseam","wpautop","entry"],"acf":{"mongo_id":"ff01fb0f-1614-4643-9f8b-91f7986fc5e6","order":"0","is_powered_by":true,"story_type":"1","photo_url":"","photo_position":"above","related_issue":[645388],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>FiT rates for all subsequent renewable energy projects to be set on a case by case basis - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FiT rates for all subsequent renewable energy projects to be set on a case by case basis\" \/>\n<meta property=\"og:description\" content=\"The Electricity Ministry will not be issuing a set feed-in tariff (FiT) rate for waste-to-energy projects and instead will set the fees on a case-by-case basis, said Electricity Minister Mohamed Shaker. It will make its determination based on the offers investors present, he tells Al Borsa. The ministry had initially settled on a FiT of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2017-07-19T03:43:53+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"FiT rates for all subsequent renewable energy projects to be set on a case by case basis\",\"datePublished\":\"2017-07-19T03:43:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/\"},\"wordCount\":195,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"energy\",\"EnterpriseAM\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/\",\"name\":\"FiT rates for all subsequent renewable energy projects to be set on a case by case basis - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2017-07-19T03:43:53+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"FiT rates for all subsequent renewable energy projects to be set on a case by case basis\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"FiT rates for all subsequent renewable energy projects to be set on a case by case basis - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/","og_locale":"en_US","og_type":"article","og_title":"FiT rates for all subsequent renewable energy projects to be set on a case by case basis","og_description":"The Electricity Ministry will not be issuing a set feed-in tariff (FiT) rate for waste-to-energy projects and instead will set the fees on a case-by-case basis, said Electricity Minister Mohamed Shaker. It will make its determination based on the offers investors present, he tells Al Borsa. The ministry had initially settled on a FiT of [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2017-07-19T03:43:53+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"FiT rates for all subsequent renewable energy projects to be set on a case by case basis","datePublished":"2017-07-19T03:43:53+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/"},"wordCount":195,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["energy","EnterpriseAM"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/","url":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/","name":"FiT rates for all subsequent renewable energy projects to be set on a case by case basis - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2017-07-19T03:43:53+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/07\/19\/fit-rates-for-all-subsequent-renewable-energy-projects-to-be-set-on-a-case-by-case-basis\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"FiT rates for all subsequent renewable energy projects to be set on a case by case basis"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":639544,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/10\/31\/the-latest-on-egypts-burgeoning-renewable-energy-sector\/","url_meta":{"origin":645422,"position":0},"title":"The latest on Egypt\u2019s burgeoning renewable energy sector","author":"enterpriseam admin","date":"31 October 2017","format":false,"excerpt":"Egypt\u2019s renewable energy sector under the second feed-in tariff program has been on a tear in the past couple of weeks. Herewith, a roundup of recent developments, including news yesterday and overnight (background here, here and here, for those so inclined):International institutional interest in solar helps 30 companies close on\u2026","rel":"","context":"In &quot;Spotlight&quot;","block_context":{"text":"Spotlight","link":"https:\/\/enterpriseam.com\/egypt\/category\/explainers\/spotlight\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":636949,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/11\/05\/ismail-cabinet-reconsiders-setting-up-fit-system-for-waste-to-energy-projects\/","url_meta":{"origin":645422,"position":1},"title":"Ismail cabinet reconsiders setting up FiT system for waste-to-energy projects","author":"enterpriseam admin","date":"5 November 2017","format":false,"excerpt":"The Ismail cabinet reportedly approved hiring a consultant to revisit the feasibility study on a feed-in tariff rate for waste-to-energy projects, government sources tell Al Borsa. The government is reportedly leaning towards setting a three-tier FiT system: the first would be fuel derived from burning such things as rice straws\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":568143,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/20\/boom-time-for-renewables\/","url_meta":{"origin":645422,"position":2},"title":"Boom time for renewables?","author":"enterpriseam admin","date":"20 December 2020","format":false,"excerpt":"Another 2.4k GW of electricity generated from renewable sources by 2022? The Electricity Ministry is negotiating renewable energy projects with a capacity of 1.4 GW, on top of an agreement to implement 1 GW of plants signed last Saturday, Minister Mohamed Shaker said in a statement to the local press\u2026","rel":"","context":"In &quot;RENEWABLES&quot;","block_context":{"text":"RENEWABLES","link":"https:\/\/enterpriseam.com\/egypt\/category\/renewables\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2020\/12\/331.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":575548,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/10\/19\/egypt-in-talks-with-foreign-investors-over-2-gw-renewable-energy-projects\/","url_meta":{"origin":645422,"position":3},"title":"Egypt in talks with foreign investors over 2 GW renewable energy projects","author":"enterpriseam admin","date":"19 October 2020","format":false,"excerpt":"INVESTMENT WATCH- Egypt is currently negotiating with foreign investors on new wind and solar projects that will generate a combined 2 GW of power, Electricity Minister Mohamed Shaker said on Thursday, CNBC Arabia reports. Speaking at the inauguration of Siemens Energy\u2019s training academy and service center at the Suez Canal\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2020\/10\/195.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":557376,"url":"https:\/\/enterpriseam.com\/egypt\/2021\/09\/16\/two-renewable-energy-producers-want-to-delay-work-on-their-egypt-projects\/","url_meta":{"origin":645422,"position":4},"title":"Two renewable energy producers want to delay work on their Egypt projects","author":"enterpriseam admin","date":"16 September 2021","format":false,"excerpt":"Global inflation is delaying renewable energy projects in Egypt: Two major Middle Eastern energy companies have recently asked to postpone renewable projects under pressure from rising input prices, an official at the New and Renewable Energy Authority (NREA) tells Enterprise. Saudi Arabia\u2019s ACWA Power and the UAE\u2019s Al Nowais have\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2021\/9\/220.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":637367,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/11\/14\/nrea-to-tender-400-mw-solar-and-wind-projects-in-2018\/","url_meta":{"origin":645422,"position":5},"title":"NREA to tender 400 MW solar and wind projects in 2018","author":"enterpriseam admin","date":"14 November 2017","format":false,"excerpt":"The New and Renewable Energy Authority (NREA) is planning to tender solar and wind projects with a combined production capacity of 400 MW, NREA head Mohamed El Khayat tells Al Borsa. Among these projects is a 20 MW solar power plant that will be funded by the Japanese International Cooperation\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/645422","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=645422"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/645422\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/645388"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=645422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=645422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=645422"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=645422"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=645422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}