{"id":636021,"date":"2017-12-19T04:03:56","date_gmt":"2017-12-19T04:03:56","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/"},"modified":"2017-12-19T04:03:56","modified_gmt":"2017-12-19T04:03:56","slug":"electricity-ministry-ups-target-for-renewable-energy-development","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/","title":{"rendered":"Electricity Ministry ups target for renewable energy development"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-07\"><\/a> <strong>Egypt plans to generate 42% of its electricity from renewable energy by <\/strong>2025, Electricity Minister Mohamed Shaker <a href=\"https:\/\/www.bloomberg.com\/news\/articles\/2017-12-18\/egypt-to-generate-42-of-electricity-from-renewables-by-2025\">tells Bloomberg<\/a>. That represents an ambitious expansion of the target initially set out by the government, which mandated that 20% of Egypt\u2019s power needs will be met by renewable resources by 2022 \u2014 and to 65% by 2050. The increase likely follows the interest international institutions have shown in the Benban solar park after the launch of Phase 2 of the feed-in tariff (FiT) program and investing USD 1.8 bn in the project. The full lineup of companies in Phase 2 will be announced in mid-January, Electricity Ministry <a href=\"https:\/\/alborsanews.com\/2017\/12\/18\/1073002\">sources tell Al Borsa<\/a>.<\/p>\n<p><strong>It\u2019s looking good for Benban solar companies:<\/strong> The committee reviewing financial and technical offers appears to be leaning towards accepting all comers, especially considering that the overwhelming majority of companies have reached financial close on their projects. <strong>Separately, the New and Renewable Energy Authority (NREA) is looking for a EGP 1 bn revolving loan <\/strong>to help fund rooftop solar installations with a combined capacity of 500 KW, NREA sources tell Al Borsa, NREA <a href=\"https:\/\/alborsanews.com\/2017\/12\/18\/1072869\">sources tell Al Borsa<\/a>. The authority has entered into talks with five banks for the loan, including Banque Misr, the National Bank of Egypt, and CIB.<\/p>\n<p>In other news from the sector: <strong>Contracts for the interconnection of the Egyptian and Saudi electricity grids will be signed in March or April 2018<\/strong>, Shaker said, <a href=\"https:\/\/www.bloomberg.com\/news\/articles\/2017-12-18\/egypt-plans-power-link-to-saudi-arabia-in-1-6-billion-project\">according to Bloomberg<\/a>. The project will carry a total cost of USD 1.6 bn, of which Egypt will pay USD 600 mn, Shaker says. Construction will take two years and the link with Saudi Arabia should have a capacity of 3,000 MW. Egypt already has a 450 MW link with Jordan and a 200 MW one with Libya. The link will allow Egypt to export electricity in times of surplus and then import power during shortages.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Egypt plans to generate 42% of its electricity from renewable energy by 2025, Electricity Minister Mohamed Shaker tells Bloomberg. That represents an ambitious expansion of the target initially set out by the government, which mandated that 20% of Egypt\u2019s power needs will be met by renewable resources by 2022 \u2014 and to 65% by 2050. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8572],"tags":[72,2380],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-636021","post","type-post","status-publish","format-standard","hentry","category-speed-round","tag-enterpriseam","tag-speed-round","wpautop","entry"],"acf":{"mongo_id":"c7b01ae4-6695-486a-9f9f-68c16a8d299d","order":"0","is_powered_by":true,"section_story_id":"e1a28d84-76de-4618-aa7a-42ce8bde80c0","story_type":"1","photo_url":"","photo_position":"above","related_issue":[636003],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Electricity Ministry ups target for renewable energy development - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electricity Ministry ups target for renewable energy development\" \/>\n<meta property=\"og:description\" content=\"Egypt plans to generate 42% of its electricity from renewable energy by 2025, Electricity Minister Mohamed Shaker tells Bloomberg. That represents an ambitious expansion of the target initially set out by the government, which mandated that 20% of Egypt\u2019s power needs will be met by renewable resources by 2022 \u2014 and to 65% by 2050. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2017-12-19T04:03:56+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Electricity Ministry ups target for renewable energy development\",\"datePublished\":\"2017-12-19T04:03:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/\"},\"wordCount\":303,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"EnterpriseAM\",\"SPEED ROUND\"],\"articleSection\":[\"Speed Round\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/\",\"name\":\"Electricity Ministry ups target for renewable energy development - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2017-12-19T04:03:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electricity Ministry ups target for renewable energy development\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Electricity Ministry ups target for renewable energy development - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/","og_locale":"en_US","og_type":"article","og_title":"Electricity Ministry ups target for renewable energy development","og_description":"Egypt plans to generate 42% of its electricity from renewable energy by 2025, Electricity Minister Mohamed Shaker tells Bloomberg. That represents an ambitious expansion of the target initially set out by the government, which mandated that 20% of Egypt\u2019s power needs will be met by renewable resources by 2022 \u2014 and to 65% by 2050. [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2017-12-19T04:03:56+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Electricity Ministry ups target for renewable energy development","datePublished":"2017-12-19T04:03:56+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/"},"wordCount":303,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["EnterpriseAM","SPEED ROUND"],"articleSection":["Speed Round"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/","url":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/","name":"Electricity Ministry ups target for renewable energy development - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2017-12-19T04:03:56+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/19\/electricity-ministry-ups-target-for-renewable-energy-development\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Electricity Ministry ups target for renewable energy development"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":596275,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/08\/22\/electricity-ministry-to-offer-200-mws-solar-plants-in-benban-in-tender\/","url_meta":{"origin":636021,"position":0},"title":"Electricity Ministry to offer 200 MWs solar plants in Benban in tender","author":"enterpriseam admin","date":"22 August 2019","format":false,"excerpt":"The National Renewable Energy Authority is planning to tender solar power plants with a combined capacity of 200 MW in the Benban solar facility in Aswan, Electricity Ministry officials told Al Mal. The projects will require around EGP 3 bn of investments.","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":573067,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/07\/19\/nrea-to-issue-international-tender-for-50-mw-solar-plant-in-egypts-benban-park\/","url_meta":{"origin":636021,"position":1},"title":"NREA to issue international tender for 50 MW solar plant in Egypt\u2019s Benban park","author":"enterpriseam admin","date":"19 July 2020","format":false,"excerpt":"The New and Renewable Energy Authority plans to issue an international tender next month for the construction of a 50 MW solar power plant in Aswan\u2019s Benban park, Al Mal reports, citing an unnamed Electricity Ministry source. The EGP 1.4 bn plant will be financed by the Kuwait Fund for\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":591334,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/12\/03\/egypts-benban-solar-part-to-be-inaugurated-in-december\/","url_meta":{"origin":636021,"position":2},"title":"Egypt\u2019s Benban solar part to be inaugurated in December","author":"enterpriseam admin","date":"3 December 2019","format":false,"excerpt":"The Benban solar energy park in Aswan is slated for inauguration this month, sources from the Electricity Ministry told the local press. Benban was due for inauguration in November as USD 2 bn, 1.46 GW-worth of solar plants have already started commercial operations. Among the companies that built power plants\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":594056,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/10\/17\/egypt-to-inaugurate-benban-solar-park-in-november\/","url_meta":{"origin":636021,"position":3},"title":"Egypt to inaugurate Benban solar park in November","author":"enterpriseam admin","date":"17 October 2019","format":false,"excerpt":"Egypt will inaugurate the USD 2 bn, 1.4 GW Benban solar energy park in Aswan at the end of November, Electricity Minister Mohamed Shaker said, Al Mal reported. Twenty-nine plants have already been linked to the national grid and began commercial operations. Egypt aims to produce 20% of its energy\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":624482,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/09\/10\/shanghai-electric-and-tiba-group-bidding-on-usd-600-mn-worth-of-solar-projects\/","url_meta":{"origin":636021,"position":4},"title":"Shanghai Electric and TIBA Group bidding on USD 600 mn worth of solar projects","author":"enterpriseam admin","date":"10 September 2018","format":false,"excerpt":"INVESTMENT WATCH- China eyes solar power projects. China\u2019s Shanghai Electric and TIBA Group are currently bidding on USD 600 mn-worth of solar power station projects with a combined generating capacity of 600 MW, unnamed ministry sources tell Al Masdar. The companies are reportedly vying to develop the solar power stations\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":557376,"url":"https:\/\/enterpriseam.com\/egypt\/2021\/09\/16\/two-renewable-energy-producers-want-to-delay-work-on-their-egypt-projects\/","url_meta":{"origin":636021,"position":5},"title":"Two renewable energy producers want to delay work on their Egypt projects","author":"enterpriseam admin","date":"16 September 2021","format":false,"excerpt":"Global inflation is delaying renewable energy projects in Egypt: Two major Middle Eastern energy companies have recently asked to postpone renewable projects under pressure from rising input prices, an official at the New and Renewable Energy Authority (NREA) tells Enterprise. Saudi Arabia\u2019s ACWA Power and the UAE\u2019s Al Nowais have\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2021\/9\/220.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/636021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=636021"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/636021\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/636003"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=636021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=636021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=636021"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=636021"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=636021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}