{"id":629204,"date":"2018-05-24T04:10:08","date_gmt":"2018-05-24T04:10:08","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/"},"modified":"2018-05-24T04:10:08","modified_gmt":"2018-05-24T04:10:08","slug":"transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/","title":{"rendered":"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-07\"><\/a> <strong>Officials broke ground yesterday on the third phase of Cairo Metro Line 3<\/strong>, <a href=\"http:\/\/www.cabinet.gov.eg\/Arabic\/MediaCenter\/CabinetNews\/Pages\/Metro-phase-3.aspx\">a Cabinet statement says<\/a>. Our friends at Orascom Construction began their tunneling work on the line right after Prime Minister Sherif Ismail gave the signal at a ceremony, according to <a href=\"https:\/\/ent.news\/2018\/5\/427.pdf\">an emailed statement (pdf)<\/a>, which explains that the project is being executed by \u201can Egyptian-French joint venture comprised of VINCI, Bouygues and Arab Contractors\u201d and that the third phase of Line III will stretch across 18 km of tunneling and viaduct works, including 15 elevated, grade and underground stations,\u201d according to Orascom.<\/p>\n<p><strong>Background:<\/strong> Orascom and Eurovia subsidiary ETF <a href=\"https:\/\/enterprise.press\/stories\/2016\/11\/09\/transportation-ministry-inks-third-phase-of-cairo-metro-line-3-agreement\/\">had signed back in 2016<\/a> the EGP 180 mn + EUR 60 mn agreement to execute the civil and track work for the line with the Transport Ministry. A EUR 300 mn loan from the French Development Agency and a EUR 600 mn loan from the European Investment Bank are covering 60% of the project\u2019s cost, while the Egyptian government will cover the remainder. The total price tag stands at EUR 1.53 bn and EGP 10.5 bn, according to National Authority for Tunnels (NAT) <a href=\"https:\/\/alborsanews.com\/2018\/05\/23\/1107046\">head Tarek Gamal El Din<\/a>.<\/p>\n<p><strong>This phase is expected to be complete and operational in around six years<\/strong>, Gamal El Din said, <a href=\"http:\/\/d1y99r0ynoudrd.cloudfront.net\/news\/details\/1293179\">Al Masry Al Youm reports.<\/a> Once it opens its doors to commuters, it will save state coffers c. EGP 2 bn per annum from lower fuel consumption and broad environmental benefits, according to <a href=\"https:\/\/alborsanews.com\/2018\/05\/23\/1107051\">Transport Minister Hisham Arafat<\/a>.<\/p>\n<p><strong>NAT and French public transport operator RATP <\/strong><a href=\"https:\/\/enterprise.press\/stories\/2018\/04\/18\/nat-frances-ratp-plan-to-set-up-a-jv-to-operate-maintain-cairo-metro-line-3\/\"><strong>had been in talks<\/strong><\/a><strong> to establish a JV to operate the new line<\/strong>. Suggestions of the JV entails an 80\/20 split ownership, with NAT holding the largest piece of cake. Since April, NAT has been waiting on amendments to the law regulating the authority\u2019s operations to finalize the agreements for the new company, according to NAT spokesman Hassan Tawfik. Zaki Hashem & Partners are reportedly acting as legal advisors to RATP.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Officials broke ground yesterday on the third phase of Cairo Metro Line 3, a Cabinet statement says. Our friends at Orascom Construction began their tunneling work on the line right after Prime Minister Sherif Ismail gave the signal at a ceremony, according to an emailed statement (pdf), which explains that the project is being executed [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8572],"tags":[72,2380],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-629204","post","type-post","status-publish","format-standard","hentry","category-speed-round","tag-enterpriseam","tag-speed-round","wpautop","entry"],"acf":{"mongo_id":"64821744-71df-4fed-9663-c541bd95ddfd","order":"0","is_powered_by":true,"section_story_id":"e370e34a-ec9e-459b-a1d2-1ede0835d696","story_type":"1","photo_url":"","photo_position":"above","related_issue":[629186],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Transportation Ministry breaks ground on final phase of Cairo Metro Line 3 - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3\" \/>\n<meta property=\"og:description\" content=\"Officials broke ground yesterday on the third phase of Cairo Metro Line 3, a Cabinet statement says. Our friends at Orascom Construction began their tunneling work on the line right after Prime Minister Sherif Ismail gave the signal at a ceremony, according to an emailed statement (pdf), which explains that the project is being executed [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2018-05-24T04:10:08+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3\",\"datePublished\":\"2018-05-24T04:10:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/\"},\"wordCount\":320,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"EnterpriseAM\",\"SPEED ROUND\"],\"articleSection\":[\"Speed Round\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/\",\"name\":\"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3 - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2018-05-24T04:10:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3 - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/","og_locale":"en_US","og_type":"article","og_title":"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3","og_description":"Officials broke ground yesterday on the third phase of Cairo Metro Line 3, a Cabinet statement says. Our friends at Orascom Construction began their tunneling work on the line right after Prime Minister Sherif Ismail gave the signal at a ceremony, according to an emailed statement (pdf), which explains that the project is being executed [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2018-05-24T04:10:08+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3","datePublished":"2018-05-24T04:10:08+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/"},"wordCount":320,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["EnterpriseAM","SPEED ROUND"],"articleSection":["Speed Round"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/","url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/","name":"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3 - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2018-05-24T04:10:08+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/24\/transportation-ministry-breaks-ground-on-final-phase-of-cairo-metro-line-3\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Transportation Ministry breaks ground on final phase of Cairo Metro Line 3"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":647546,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/14\/tunneling-completed-for-the-cairo-metro-line-3s-phase-4a\/","url_meta":{"origin":629204,"position":0},"title":"Tunneling completed for the Cairo Metro Line 3\u2019s Phase 4A","author":"enterpriseam admin","date":"14 May 2017","format":false,"excerpt":"Tunneling operations of Cairo Metro Line 3\u2019s phase 4A was completed at a total cost of EUR 257 mn as well as local currency portion of EGP 1.8 bn, Transport Minister Hisham Arafat said, according to Ahram Gate. Phase 4A, which is 5.15 km long and includes five stations will\u2026","rel":"","context":"In &quot;Infrastructure&quot;","block_context":{"text":"Infrastructure","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/infrastructure\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":596366,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/08\/26\/mitsubishi-orascom-consortium-wins-tender-for-first-phase-of-metro-line-4\/","url_meta":{"origin":629204,"position":1},"title":"Mitsubishi-Orascom consortium wins tender for first phase of metro line 4","author":"enterpriseam admin","date":"26 August 2019","format":false,"excerpt":"The National Authority for Tunnels awarded a Mitsubishi-Orascom consortium the contract to construct the railway and depot, and to set up the railway system for the first phase of Cairo Metro Line 4, according to the authority (pdf). The agreement was worth a combined EGP 3.8 bn, EUR 397.3 mn,\u2026","rel":"","context":"In &quot;Automotive + Transportation&quot;","block_context":{"text":"Automotive + Transportation","link":"https:\/\/enterpriseam.com\/egypt\/category\/automotive-transportation\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":547522,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/06\/26\/usd-659-mn-in-contracts-signed-for-cairos-metro-line-4\/","url_meta":{"origin":629204,"position":2},"title":"USD 659 mn in contracts signed for Cairo\u2019s Metro Line 4","author":"enterpriseam admin","date":"26 June 2022","format":false,"excerpt":"Thales, Orascom Construction and Colas Rail have landed a contract for construction work on the first phase of Cairo\u2019s fourth metro line, Thales said in a statement last week.The contract is worth some USD 659 mn, with USD 159 mn of that for Colas, the company said in a separate\u2026","rel":"","context":"In &quot;Transport&quot;","block_context":{"text":"Transport","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/transport\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/6\/297.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":648014,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/05\/25\/transport-ministry-to-launch-tender-for-cairo-metro-line-3-private-sector-operator\/","url_meta":{"origin":629204,"position":3},"title":"Transport Ministry to launch tender for Cairo Metro Line 3 private sector operator","author":"enterpriseam admin","date":"25 May 2017","format":false,"excerpt":"Is the government privatizing management of the Cairo Metro? The Transport Ministry is set to launch a tender for a private sector company to operate Cairo Metro Line 3, Transport Minister Hisham Arafat tells Al Borsa. A non-state-owned company will also be tasked with operating Cairo Metro Line 4. Tunneling\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":574211,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/09\/02\/french-transportation-firm-ratp-dev-to-run-cairo-metro-line-3\/","url_meta":{"origin":629204,"position":4},"title":"French transportation firm RATP Dev to run Cairo Metro Line 3","author":"enterpriseam admin","date":"2 September 2020","format":false,"excerpt":"French transportation firm RATP Dev will run Cairo Metro Line 3: The National Authority for Tunnels (NAT) signed a EUR 1.14 bn contract with French transportation firm RATP Dev to operate the Cairo metro\u2019s third line for a period of 15 years, according to a Transport Ministry statement. RATP Dev\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2020\/9\/22.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":625360,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/08\/02\/ebrd-provides-eur-205-mn-loan-for-cairo-metro-line-1-rehabilitation\/","url_meta":{"origin":629204,"position":5},"title":"EBRD provides EUR 205 mn loan for Cairo Metro Line 1 rehabilitation","author":"enterpriseam admin","date":"2 August 2018","format":false,"excerpt":"INFRASTRUCTURE WATCH- EBRD provides EUR 205 mn loan to rehab Cairo Metro\u2019s Line 1: The Madbouly government signed yesterday a EUR 205 mn loan agreement with the European Bank for Reconstruction and Development (EBRD) to finance the rehabilitation of infrastructure on the Cairo Metro\u2019s Line 1, according to a Cabinet\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/629204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=629204"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/629204\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/629186"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=629204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=629204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=629204"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=629204"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=629204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}