{"id":629043,"date":"2018-05-21T04:12:05","date_gmt":"2018-05-21T04:12:05","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/"},"modified":"2018-05-21T04:12:05","modified_gmt":"2018-05-21T04:12:05","slug":"egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/","title":{"rendered":"Egypt and Sudan signing grid connection contracts in two weeks"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-06\"><\/a> <strong>EXCLUSIVE- Egypt and Sudan will sign contracts to connect their electricity grid in two weeks\u2019 time. <\/strong>The next milestone on our march toward becoming a regional energy hub will see Egypt and Sudan sign in two weeks\u2019 time contracts to connect their electricity grids, Electricity Holding Company head Gaber El Desouky tells Enterprise. <strong>The holding company has no plans to seek external financing for the USD 60-70 mn project<\/strong>, El Desouky added. The project looks to be on the fast track: Desouky said to expect development work to begin within three months of a tender. As many as <a href=\"http:\/\/almalnews.com\/Story\/376036\/59\/8-%D8%B4%D8%B1%D9%83%D8%A7%D8%AA-%D8%B9%D8%A7%D9%84%D9%85%D9%8A%D8%A9-%D9%88%D9%85%D8%AD%D9%84%D9%8A%D8%A9-%D8%AA%D8%B4%D8%A7%D8%B1%D9%83-%D9%81%D9%89-%D9%85%D9%85%D8%A7%D8%B1%D8%B3%D8%A9-%D8%A7%D9%84%D8%B1%D8%A8%D8%B7-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A6%D9%89-%D9%85%D8%B9-%D8%A7%D9%84%D8%B3%D9%88%D8%AF%D8%A7%D9%86\">eight local and global players<\/a> have been invited to participate in the prospective tender, among them ABB, General Electric, Elsewedy, Schneider, Siemens, and State Grid Corporation of China. <a href=\"https:\/\/enterprise.press\/stories\/2018\/04\/11\/electricity-ministry-holds-talks-to-finance-usd-500-mn-electricity-grid-connection-project-with-sudan\/\"><strong>Earlier reports<\/strong><\/a><strong> in the domestic press had suggested the Sudan interconnection project would cost as much as USD 500 mn <\/strong>and that the state was seeking international financing to push it along.<\/p>\n<p><strong>El Desouky also confirmed that contracts to connect Egypt\u2019s grid to Saudi Arabia\u2019s will be signed at the end of June.<\/strong> These agreements, which come as part of the state\u2019s drive to position Egypt as a regional energy hub, come with a view to ultimately allowing the increasingly deregulated industry to buy and sell power regionally. <a href=\"https:\/\/alborsanews.com\/2018\/05\/14\/1105144\">Talks with Cyprus and Greece<\/a> on a USD 4 bn interconnection project will kick start within the coming month when a Cypriot delegation visits.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>EXCLUSIVE- Egypt and Sudan will sign contracts to connect their electricity grid in two weeks\u2019 time. The next milestone on our march toward becoming a regional energy hub will see Egypt and Sudan sign in two weeks\u2019 time contracts to connect their electricity grids, Electricity Holding Company head Gaber El Desouky tells Enterprise. The holding [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8572],"tags":[72,2380],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-629043","post","type-post","status-publish","format-standard","hentry","category-speed-round","tag-enterpriseam","tag-speed-round","wpautop","entry"],"acf":{"mongo_id":"d4ef245b-cb56-4316-9cc8-5f2eddcc3c28","order":"0","is_powered_by":true,"section_story_id":"57521570-3e00-4b35-9071-bb51df4ac545","story_type":"1","photo_url":"","photo_position":"above","related_issue":[629027],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Egypt and Sudan signing grid connection contracts in two weeks - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Egypt and Sudan signing grid connection contracts in two weeks\" \/>\n<meta property=\"og:description\" content=\"EXCLUSIVE- Egypt and Sudan will sign contracts to connect their electricity grid in two weeks\u2019 time. The next milestone on our march toward becoming a regional energy hub will see Egypt and Sudan sign in two weeks\u2019 time contracts to connect their electricity grids, Electricity Holding Company head Gaber El Desouky tells Enterprise. The holding [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2018-05-21T04:12:05+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Egypt and Sudan signing grid connection contracts in two weeks\",\"datePublished\":\"2018-05-21T04:12:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/\"},\"wordCount\":249,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"EnterpriseAM\",\"SPEED ROUND\"],\"articleSection\":[\"Speed Round\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/\",\"name\":\"Egypt and Sudan signing grid connection contracts in two weeks - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2018-05-21T04:12:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Egypt and Sudan signing grid connection contracts in two weeks\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Egypt and Sudan signing grid connection contracts in two weeks - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/","og_locale":"en_US","og_type":"article","og_title":"Egypt and Sudan signing grid connection contracts in two weeks","og_description":"EXCLUSIVE- Egypt and Sudan will sign contracts to connect their electricity grid in two weeks\u2019 time. The next milestone on our march toward becoming a regional energy hub will see Egypt and Sudan sign in two weeks\u2019 time contracts to connect their electricity grids, Electricity Holding Company head Gaber El Desouky tells Enterprise. The holding [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2018-05-21T04:12:05+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Egypt and Sudan signing grid connection contracts in two weeks","datePublished":"2018-05-21T04:12:05+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/"},"wordCount":249,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["EnterpriseAM","SPEED ROUND"],"articleSection":["Speed Round"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/","url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/","name":"Egypt and Sudan signing grid connection contracts in two weeks - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2018-05-21T04:12:05+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/21\/egypt-and-sudan-signing-grid-connection-contracts-in-two-weeks\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Egypt and Sudan signing grid connection contracts in two weeks"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":629306,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/28\/on-the-horizon-36\/","url_meta":{"origin":629043,"position":0},"title":"On the horizon","author":"enterpriseam admin","date":"28 May 2018","format":false,"excerpt":"Do you have an idea for a tech-enabled business idea that could make agriculture in Egypt more efficient? The World Bank may have seed funding, access to mentorship, and an accelerator \/ incubator program for you through its \u201cDigitalAG4Egypt\u201d program. The deadline for submissions is 1 July. Tap or click\u2026","rel":"","context":"In &quot;ON THE HORIZON&quot;","block_context":{"text":"ON THE HORIZON","link":"https:\/\/enterpriseam.com\/egypt\/category\/on-the-horizon\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":629360,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/29\/on-the-horizon-37\/","url_meta":{"origin":629043,"position":1},"title":"On the horizon","author":"enterpriseam admin","date":"29 May 2018","format":false,"excerpt":"Do you have an idea for a tech-enabled business idea that could make agriculture in Egypt more efficient? The World Bank may have seed funding, access to mentorship, and an accelerator \/ incubator program for you through its \u201cDigitalAG4Egypt\u201d program. The deadline for submissions is 1 July. Tap or click\u2026","rel":"","context":"In &quot;ON THE HORIZON&quot;","block_context":{"text":"ON THE HORIZON","link":"https:\/\/enterpriseam.com\/egypt\/category\/on-the-horizon\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":629427,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/30\/shoukry-sudans-al-dhikheri-talk-gerd-bilateral-issues\/","url_meta":{"origin":629043,"position":2},"title":"Shoukry, Sudan\u2019s Al Dhikheri talk GERD, bilateral issues","author":"enterpriseam admin","date":"30 May 2018","format":false,"excerpt":"Sudan, Egypt see eye-to-eye on GERD (until the next minor gaffe sends them backwards): Foreign Minister Sameh Shoukry met with his Sudanese counterpart Al Dridiri Al Dhikheri in Cairo yesterday to discuss the latest developments related to the Grand Ethiopian Renaissance Dam (GERD), according to a ministry statement. Egypt and\u2026","rel":"","context":"In &quot;Diplomacy + Foreign Trade&quot;","block_context":{"text":"Diplomacy + Foreign Trade","link":"https:\/\/enterpriseam.com\/egypt\/category\/diplomacy-foreign-trade\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":629144,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/23\/on-the-horizon-33\/","url_meta":{"origin":629043,"position":3},"title":"On the horizon","author":"enterpriseam admin","date":"23 May 2018","format":false,"excerpt":"Do you have an idea for a tech-enabled business idea that could make agriculture in Egypt more efficient? The World Bank may have seed funding for you. The World Bank\u2019s \u201cDigitalAG4Egypt\u201d program is looking for business ideas built around logistics, value-added services, fintech relevant to agriculture, smart agriculture and natural\u2026","rel":"","context":"In &quot;ON THE HORIZON&quot;","block_context":{"text":"ON THE HORIZON","link":"https:\/\/enterpriseam.com\/egypt\/category\/on-the-horizon\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":627394,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/","url_meta":{"origin":629043,"position":4},"title":"First phase of Egypt-Sudan electricity interconnection project to be operational by December","author":"enterpriseam admin","date":"31 July 2018","format":false,"excerpt":"The first phase of Egypt\u2019s 300 MW, USD 60-70 mn power interconnection project with Sudan should be operational by December of this year, Egyptian Electricity Transmission Company (EETC) sources say. India\u2019s Larsen & Toubro had been awarded the contracts to link the two countries\u2019 electricity grids, and should sign the\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":633119,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/02\/27\/eehc-signs-dcs-supply-agreement-for-west-cairo-walidiya-power-stations\/","url_meta":{"origin":629043,"position":5},"title":"EEHC signs DCS supply agreement for West Cairo, Walidiya power stations","author":"enterpriseam admin","date":"27 February 2018","format":false,"excerpt":"The Egyptian Electricity Holding Company (EEHC) signed yesterday two agreements to supply distributed control systems (DCS) for the Walidiya and West Cairo power station projects, Al Masry Al Youm reports. These include a USD 1.2 mn contract with Honeywell for the West Cairo station and a separate c. USD 1.5\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/629043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=629043"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/629043\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/629027"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=629043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=629043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=629043"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=629043"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=629043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}