{"id":627394,"date":"2018-07-31T03:49:10","date_gmt":"2018-07-31T03:49:10","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/"},"modified":"2018-07-31T03:49:10","modified_gmt":"2018-07-31T03:49:10","slug":"first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/","title":{"rendered":"First phase of Egypt-Sudan electricity interconnection project to be operational by December"},"content":{"rendered":"<p><strong>The first phase of Egypt\u2019s 300 MW, USD 60-70 mn power interconnection project with Sudan should be operational by December of this year<\/strong>, Egyptian Electricity Transmission Company <a href=\"https:\/\/www.alborsanews.com\/2018\/07\/30\/1120134\">(EETC) sources say<\/a>. India\u2019s Larsen & Toubro had been awarded the contracts to link the two countries\u2019 electricity grids, and should sign the final agreement \u201csoon,\u201d Electricity Minister Mohamed Shaker had <a href=\"https:\/\/enterprise.press\/stories\/2018\/07\/12\/indian-company-awarded-usd-60-70-mn-contracts-for-sudan-interconnection\/\">said earlier this month<\/a>. This comes as the USD 1.6 bn Egypt-Saudi power interconnection project <a href=\"https:\/\/enterprise.press\/stories\/2018\/07\/29\/saudi-interconnection-project-pushed-to-2022-from-2020-sources\/\">has reportedly been pushed<\/a> to 2022 from 2020 as plans have been redrawn to accommodate the development of the Neom robot city.<\/p>\n<p>On a related note,<strong> the Egyptian Electricity Holding Company (EEHC) is planning to launch USD 4.8 bn a tender before the end of the year for the development of two power plants<\/strong> in Luxor and Qena worth a total , <a href=\"http:\/\/almalnews.com\/Story\/384380\/59\/%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1-%D8%AA%D8%AE%D8%B7%D8%B7-%D9%84%D8%A5%D9%86%D8%B4%D8%A7%D8%A1-%D9%85%D8%AD%D8%B7%D8%AA%D9%89-%D8%AA%D9%88%D9%84%D9%8A%D8%AF-%D8%A8%D8%A7%D9%84%D8%A3%D9%82%D8%B5%D8%B1-%D9%88%D9%82%D9%86%D8%A7-%D8%A8%D8%A7%D8%B3%D8%AA%D8%AB%D9%85%D8%A7%D8%B1%D8%A7%D8%AA-4-8-%D9%85%D9%84%D9%8A%D8%A7%D8%B1-%D8%AF%D9%88%D9%84%D8%A7%D8%B1\">unnamed EEHC sources tell Al Mal<\/a>. Negotiations are ongoing with international lenders to secure funding for the two stations, which would add a combined 4 GW of capacity to the national grid. The Electricity Ministry is considering establishing the projects under a build-own-operate framework with seven-year contracts. We had noted earlier that <a href=\"https:\/\/enterprise.press\/stories\/2018\/07\/17\/eehc-to-sign-contracts-with-chinas-sinohydro-for-usd-2-6-bn-hydraulic-power-station-in-ataqa-next-month\/\">EEHC was reviewing offers<\/a> from international consultants including Artelia Group, Black and Veatch, and Fichtner.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first phase of Egypt\u2019s 300 MW, USD 60-70 mn power interconnection project with Sudan should be operational by December of this year, Egyptian Electricity Transmission Company (EETC) sources say. India\u2019s Larsen &#038; Toubro had been awarded the contracts to link the two countries\u2019 electricity grids, and should sign the final agreement \u201csoon,\u201d Electricity Minister [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8572],"tags":[72,2380],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-627394","post","type-post","status-publish","format-standard","hentry","category-speed-round","tag-enterpriseam","tag-speed-round","wpautop","entry"],"acf":{"mongo_id":"1b459cee-13f3-4bf4-9315-156e94a292cb","order":"0","is_powered_by":true,"section_story_id":"6aa0b97a-468c-41d0-9324-2305d131a938","story_type":"1","photo_url":"","photo_position":"above","related_issue":[627382],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>First phase of Egypt-Sudan electricity interconnection project to be operational by December - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First phase of Egypt-Sudan electricity interconnection project to be operational by December\" \/>\n<meta property=\"og:description\" content=\"The first phase of Egypt\u2019s 300 MW, USD 60-70 mn power interconnection project with Sudan should be operational by December of this year, Egyptian Electricity Transmission Company (EETC) sources say. India\u2019s Larsen &amp; Toubro had been awarded the contracts to link the two countries\u2019 electricity grids, and should sign the final agreement \u201csoon,\u201d Electricity Minister [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2018-07-31T03:49:10+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"First phase of Egypt-Sudan electricity interconnection project to be operational by December\",\"datePublished\":\"2018-07-31T03:49:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/\"},\"wordCount\":208,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"EnterpriseAM\",\"SPEED ROUND\"],\"articleSection\":[\"Speed Round\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/\",\"name\":\"First phase of Egypt-Sudan electricity interconnection project to be operational by December - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2018-07-31T03:49:10+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First phase of Egypt-Sudan electricity interconnection project to be operational by December\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"First phase of Egypt-Sudan electricity interconnection project to be operational by December - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/","og_locale":"en_US","og_type":"article","og_title":"First phase of Egypt-Sudan electricity interconnection project to be operational by December","og_description":"The first phase of Egypt\u2019s 300 MW, USD 60-70 mn power interconnection project with Sudan should be operational by December of this year, Egyptian Electricity Transmission Company (EETC) sources say. India\u2019s Larsen & Toubro had been awarded the contracts to link the two countries\u2019 electricity grids, and should sign the final agreement \u201csoon,\u201d Electricity Minister [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2018-07-31T03:49:10+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"First phase of Egypt-Sudan electricity interconnection project to be operational by December","datePublished":"2018-07-31T03:49:10+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/"},"wordCount":208,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["EnterpriseAM","SPEED ROUND"],"articleSection":["Speed Round"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/","url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/","name":"First phase of Egypt-Sudan electricity interconnection project to be operational by December - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2018-07-31T03:49:10+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"First phase of Egypt-Sudan electricity interconnection project to be operational by December"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":550266,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/10\/20\/egypt-saudi-electricity-interconnection-finally-has-a-timeline\/","url_meta":{"origin":627394,"position":0},"title":"Egypt-Saudi electricity interconnection finally has a timeline","author":"enterpriseam admin","date":"20 October 2022","format":false,"excerpt":"Our 3 GW electricity linkup with Saudi is going live in mid-2025: Trial operations for the USD 1.8 bn Egypt-Saudi electricity interconnection are set to begin in May 2025 with an official operational launch set for later in the same year, Bloomberg Asharq quotes Egyptian Electricity Transmission Company (EETC) head\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/10\/285.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":624184,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/09\/02\/eetc-completes-designs-acquires-licenses-for-sudan-interconnection-project\/","url_meta":{"origin":627394,"position":1},"title":"EETC completes designs, acquires licenses for Sudan interconnection project","author":"enterpriseam admin","date":"2 September 2018","format":false,"excerpt":"The Egyptian Electricity Transmission Company (EETC) has completed the designs for Egypt\u2019s USD 60-70 mn power interconnection project with Sudan and acquired the necessary permits and licenses to begin construction, EETC Chairman Gamal Abdel Rehim said, Al Mal reports. The first phase of the project, which is expected to go\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":622184,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/28\/first-phase-of-egypt-sudan-electricity-interconnection-project-delayed\/","url_meta":{"origin":627394,"position":2},"title":"First phase of Egypt-Sudan electricity interconnection project delayed?","author":"enterpriseam admin","date":"28 November 2018","format":false,"excerpt":"The Electricity Ministry is expected to complete the first phase of the USD 60-70 mn power interconnection project with Sudan in six months\u2019 time, Minister Mohamed Shaker said yesterday. The first phase, which should see the two countries exchange 200-300 MW of power, had initially been expected to go live\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":578601,"url":"https:\/\/enterpriseam.com\/egypt\/2023\/01\/05\/italy-proposes-a-usd-2-8-bn-electrical-interconnection-project-with-egypt\/","url_meta":{"origin":627394,"position":3},"title":"Italy proposes a USD 2.8 bn electrical interconnection project with Egypt","author":"enterpriseam admin","date":"5 January 2023","format":false,"excerpt":"Is an Egypt-Italy electricity interconnection project coming? Italy has reportedly submitted a proposal to the Egyptian Electricity Transmission Company to work on a joint USD 2.8 bn electricity interconnection project between the two countries with a capacity of 2.5-3 GW, Bloomberg Asharq reports, citing two unnamed government sources.Italy is offering\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2023\/1\/89.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":590654,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/12\/30\/egypt-sudan-to-link-electricity-grids-on-12-january-2020-the-first-of-multiple-interconnections-over-the-next-two-years\/","url_meta":{"origin":627394,"position":4},"title":"Egypt, Sudan to link electricity grids on 12 January 2020 \u2014 the first of multiple interconnections over the next two years","author":"enterpriseam admin","date":"30 December 2019","format":false,"excerpt":"Egypt and Sudan will finish linking up their electricity grids on 12 January, sharing an initial 50 MW worth of capacity, Reuters cites state news agency MENA as having said yesterday. The project reportedly cost EGP 509 mn and spans 1,000 km. The grid interconnection project has been in the\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":626852,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/12\/indian-company-awarded-usd-60-70-mn-contracts-for-sudan-interconnection\/","url_meta":{"origin":627394,"position":5},"title":"Indian company awarded USD 60-70 mn contracts for Sudan interconnection","author":"enterpriseam admin","date":"12 July 2018","format":false,"excerpt":"An Indian company has reportedly been awarded the contract for the USD 60-70 mn power interconnection project with Sudan, Electricity Minister Mohamed Shaker said on Tuesday, according to the Sudan Tribune. Shaker reportedly said that the final contracts will be signed \u201csoon\u201d and that the first phase of the project\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/627394","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=627394"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/627394\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/627382"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=627394"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=627394"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=627394"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=627394"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=627394"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}