{"id":621613,"date":"2018-11-13T04:18:20","date_gmt":"2018-11-13T04:18:20","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/"},"modified":"2018-11-13T04:18:20","modified_gmt":"2018-11-13T04:18:20","slug":"egypt-saudi-interconnection-operational-by-2020-not-next-2022","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/","title":{"rendered":"Egypt-Saudi interconnection operational by 2020, not next 2022"},"content":{"rendered":"<p>\u201cThe USD 1.6 bn Egypt-Saudi power grid will be operational in 2020,\u201d head of the studies and design sector at the Egyptian Electricity Transmission Company (EETC) Lamya Youssef said, <a href=\"https:\/\/almalnews.com\/Story\/398157\/59\/%D9%84%D9%85%D9%8A%D8%A7%D8%A1-%D9%8A%D9%88%D8%B3%D9%81-%D8%AA%D8%B5%D8%AF%D9%8A%D8%B1-3000-%D9%85%D9%8A%D8%AC%D8%A7%D9%88%D8%A7%D8%AA-%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1-%D9%84%D9%84%D8%B3%D8%B9%D9%88%D8%AF%D9%8A%D9%87-%D9%86%D9%87%D8%A7%D9%8A%D8%A9-2020\">according to Al Mal<\/a>. The project, on which <a href=\"https:\/\/enterprise.press\/stories\/2017\/03\/15\/saudi-egypt-electricity-interconnection-project-back-on\/\">talks resumed<\/a> after a halt period, was slated for inauguration in 2020, with trial runs set for next year, but was <a href=\"https:\/\/enterprise.press\/stories\/2018\/07\/29\/saudi-interconnection-project-pushed-to-2022-from-2020-sources\/\">reportedly pushed to 2022<\/a> after Saudi\u2019s USD 500 bn <a href=\"https:\/\/enterprise.press\/stories\/2018\/02\/12\/first-contracts-awarded-for-saudi-arabias-usd-500-bn-neom-city\/\">Neom City<\/a> mega project derailed the plans. The contracts were also expected to be inked <a href=\"https:\/\/enterprise.press\/stories\/2018\/05\/06\/egypt-saudi-arabia-to-sign-electricity-interconnection-contracts-in-two-months\/\">last summer<\/a>, in time for <a href=\"https:\/\/enterprise.press\/stories\/2018\/01\/30\/egypt-saudi-delay-selecting-winning-company-on-grid-interconnection-project-until-june\/\">the selection of the winning tender bid<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u201cThe USD 1.6 bn Egypt-Saudi power grid will be operational in 2020,\u201d head of the studies and design sector at the Egyptian Electricity Transmission Company (EETC) Lamya Youssef said, according to Al Mal. The project, on which talks resumed after a halt period, was slated for inauguration in 2020, with trial runs set for next [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[769,93,72,219],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-621613","post","type-post","status-publish","format-standard","hentry","category-energy","tag-egyptera","tag-energy","tag-enterpriseam","tag-saudi-arabia","wpautop","entry"],"acf":{"mongo_id":"d1de59fe-8497-4844-8a22-4b276f0db09b","order":"0","is_powered_by":true,"story_type":"1","photo_url":"","photo_position":"above","full_issue_title":"Egypt-Saudi interconnection operational by 2020, not next 2022","related_issue":[621586],"teaser":"","voice_url":"https:\/\/s3.us-east-1.amazonaws.com\/ent.news\/audio\/2024\/6\/.47b6ed0c-5e0e-439b-97fc-6c21310a5a45.mp3"},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Egypt-Saudi interconnection operational by 2020, not next 2022 - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Egypt-Saudi interconnection operational by 2020, not next 2022\" \/>\n<meta property=\"og:description\" content=\"\u201cThe USD 1.6 bn Egypt-Saudi power grid will be operational in 2020,\u201d head of the studies and design sector at the Egyptian Electricity Transmission Company (EETC) Lamya Youssef said, according to Al Mal. The project, on which talks resumed after a halt period, was slated for inauguration in 2020, with trial runs set for next [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2018-11-13T04:18:20+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Egypt-Saudi interconnection operational by 2020, not next 2022\",\"datePublished\":\"2018-11-13T04:18:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/\"},\"wordCount\":96,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"Egyptera\",\"energy\",\"EnterpriseAM\",\"Saudi Arabia\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/\",\"name\":\"Egypt-Saudi interconnection operational by 2020, not next 2022 - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2018-11-13T04:18:20+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Egypt-Saudi interconnection operational by 2020, not next 2022\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Egypt-Saudi interconnection operational by 2020, not next 2022 - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/","og_locale":"en_US","og_type":"article","og_title":"Egypt-Saudi interconnection operational by 2020, not next 2022","og_description":"\u201cThe USD 1.6 bn Egypt-Saudi power grid will be operational in 2020,\u201d head of the studies and design sector at the Egyptian Electricity Transmission Company (EETC) Lamya Youssef said, according to Al Mal. The project, on which talks resumed after a halt period, was slated for inauguration in 2020, with trial runs set for next [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2018-11-13T04:18:20+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Egypt-Saudi interconnection operational by 2020, not next 2022","datePublished":"2018-11-13T04:18:20+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/"},"wordCount":96,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["Egyptera","energy","EnterpriseAM","Saudi Arabia"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/","url":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/","name":"Egypt-Saudi interconnection operational by 2020, not next 2022 - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2018-11-13T04:18:20+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2018\/11\/13\/egypt-saudi-interconnection-operational-by-2020-not-next-2022\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Egypt-Saudi interconnection operational by 2020, not next 2022"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":604790,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/12\/12\/egypt-saudi-power-grid-interconnection-partly-operational-september-2021\/","url_meta":{"origin":621613,"position":0},"title":"Egypt-Saudi power grid interconnection \u201cpartly operational\u201d September 2021","author":"enterpriseam admin","date":"12 December 2018","format":false,"excerpt":"The USD 1.6 bn, 3,000 MW interconnection project linking Egypt and Saudi\u2019s national power grids will be \u201cpartly operational\u201d in September 2021, Electricity Minister Mohamed Shaker said yesterday. The project\u2019s inauguration, previously slated for 2020, was delayed after Saudi\u2019s USD 500 bn Neom City mega project derailed plans. The project\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":627302,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/29\/saudi-interconnection-project-pushed-to-2022-from-2020-sources\/","url_meta":{"origin":621613,"position":1},"title":"Saudi interconnection project pushed to 2022 from 2020 -sources","author":"enterpriseam admin","date":"29 July 2018","format":false,"excerpt":"The USD 1.6 bn Egypt-Saudi power interconnection project has reportedly been pushed to 2022 from 2020, Electricity Ministry sources said on Thursday, Al Mal reports. The plans for the power lines that are meant to run through Saudi Arabia will have to be redrawn with the kingdom planning to establish\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":590654,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/12\/30\/egypt-sudan-to-link-electricity-grids-on-12-january-2020-the-first-of-multiple-interconnections-over-the-next-two-years\/","url_meta":{"origin":621613,"position":2},"title":"Egypt, Sudan to link electricity grids on 12 January 2020 \u2014 the first of multiple interconnections over the next two years","author":"enterpriseam admin","date":"30 December 2019","format":false,"excerpt":"Egypt and Sudan will finish linking up their electricity grids on 12 January, sharing an initial 50 MW worth of capacity, Reuters cites state news agency MENA as having said yesterday. The project reportedly cost EGP 509 mn and spans 1,000 km. The grid interconnection project has been in the\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":575606,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/10\/20\/egyptian-saudi-electricity-project-tender-results-to-be-announced-in-1h2021\/","url_meta":{"origin":621613,"position":3},"title":"Egyptian-Saudi electricity project tender results to be announced in 1H2021","author":"enterpriseam admin","date":"20 October 2020","format":false,"excerpt":"The Egyptian Electricity Transmission Company (EETC) will announce the winner of the Egyptian-Saudi electricity interconnection project tender in the first half of 2021, the local press reports, citing sources at the company. EETC expects to complete analysis of the technical bids in December. Companies that have submitted offers include ElSewedy\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":591580,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/12\/10\/egypt-and-saudi-arabia-to-sign-electricity-interconnection-project-by-may-2020\/","url_meta":{"origin":621613,"position":4},"title":"Egypt and Saudi Arabia to sign electricity interconnection project by May 2020","author":"enterpriseam admin","date":"10 December 2019","format":false,"excerpt":"Egypt and Saudi Arabia are due to complete signing all electricity interconnection project contracts by May 2020, head of the Egyptian Electricity Transmission Company Sabah Mashaly told the local press. She noted that a consultant has been selected to survey the route of the maritime cables, which had been changed\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":627394,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/31\/first-phase-of-egypt-sudan-electricity-interconnection-project-to-be-operational-by-december\/","url_meta":{"origin":621613,"position":5},"title":"First phase of Egypt-Sudan electricity interconnection project to be operational by December","author":"enterpriseam admin","date":"31 July 2018","format":false,"excerpt":"The first phase of Egypt\u2019s 300 MW, USD 60-70 mn power interconnection project with Sudan should be operational by December of this year, Egyptian Electricity Transmission Company (EETC) sources say. India\u2019s Larsen & Toubro had been awarded the contracts to link the two countries\u2019 electricity grids, and should sign the\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/621613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=621613"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/621613\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/621586"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=621613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=621613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=621613"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=621613"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=621613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}