{"id":595128,"date":"2019-09-17T03:56:45","date_gmt":"2019-09-17T03:56:45","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/"},"modified":"2019-09-17T03:56:45","modified_gmt":"2019-09-17T03:56:45","slug":"gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/","title":{"rendered":"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-06\"><\/a> <b>GERD talks at a gridlock again?<\/b> Ethiopia rejected last month Egypt\u2019s proposal for the timeline of filling the Grand Ethiopian Renaissance Dam\u2019s (GERD) reservoir, less than two weeks after Egypt handed it to the African country and neighboring Sudan, according to a note circulated by the Foreign Ministry to diplomats and <a href=\"https:\/\/www.reuters.com\/article\/us-ethiopia-dam-egypt-exclusive\/exclusive-egypt-and-ethiopia-at-odds-as-talks-over-blue-nile-dam-resume-idUSKBN1W1238\">seen by Reuters<\/a>. Ethiopia said that the proposal \u201cput(s) the dam filling in an impossible condition,\u201d according to the diplomatic wire, and called for a meeting of irrigation ministers to discuss its own proposal. The meeting, <a href=\"https:\/\/enterprise.press\/stories\/2019\/09\/16\/egypt-sudan-ethiopia-resume-gerd-talks-after-over-a-year\/\">which was held on Sunday and Monday<\/a> in Cairo and marked a <a href=\"https:\/\/enterprise.press\/stories\/2019\/09\/16\/egypt-sudan-ethiopia-resume-gerd-talks-after-over-a-year\/\">resumption in negotiations<\/a> after a yearlong hiatus, saw Egypt dismissing the Ethiopian plan.<\/p>\n<p><b>Why the bickering? <\/b>Both Egypt and Ethiopia\u2019s proposalsagree that it would take two years to complete the first phase of filling GERD\u2019s reservoir to 595 meters and see the dam\u2019s hydropower turbines operational. Egypt wants Ethiopia to extend this timeline if it were to coincide with extreme drought in the Blue Nile. \u201cWithout such a concession, Egypt says it would risk losing more than one mn jobs and USD 1.8 bn in economic output annually, as well as electricity valued at USD 300 mn,\u201d says the newswire. The proposal also requires a minimum yearly release of 40 bn cbm of water, but Ethiopia is eyeing 35 bcm.<\/p>\n<p><b>Egypt, Ethiopia, Sudan will hold another trilateral meeting of scientific experts<\/b> between 30 September and 3 October in Khartoum to discuss each country\u2019s proposal for filling the Grand Ethiopian Renaissance Dam\u2019s (GERD) reservoirs, <a href=\"https:\/\/www.facebook.com\/EgyptianCabinet\/posts\/1354446938067001\">cabinet said in a statement<\/a>. The meetings held earlier this week did not discuss \u201ctechnical aspects\u201d and were limited to procedural issues, notes the statement. A meeting of irrigation ministers on 4 and 5 October will \u201cimmediately\u201d follow the urgent meeting with an aim to strike an agreement after assessing each proposal.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GERD talks at a gridlock again? Ethiopia rejected last month Egypt\u2019s proposal for the timeline of filling the Grand Ethiopian Renaissance Dam\u2019s (GERD) reservoir, less than two weeks after Egypt handed it to the African country and neighboring Sudan, according to a note circulated by the Foreign Ministry to diplomats and seen by Reuters. Ethiopia [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":595129,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[8572],"tags":[168,72,382,3362,2380,126],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-595128","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-speed-round","tag-diplomacy","tag-enterpriseam","tag-ethiopia","tag-nile-basin","tag-speed-round","tag-sudan","wpautop","entry"],"acf":{"mongo_id":"a4e185eb-1339-4ce7-a4da-467861485ee4","is_powered_by":true,"section_story_id":"67e8f195-e6df-4f4f-9fd4-9133f27d3228","story_type":"1","photo_url":"https:\/\/ent.news\/2017\/12\/1315.png","photo_position":"above","related_issue":[595113],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia\" \/>\n<meta property=\"og:description\" content=\"GERD talks at a gridlock again? Ethiopia rejected last month Egypt\u2019s proposal for the timeline of filling the Grand Ethiopian Renaissance Dam\u2019s (GERD) reservoir, less than two weeks after Egypt handed it to the African country and neighboring Sudan, according to a note circulated by the Foreign Ministry to diplomats and seen by Reuters. Ethiopia [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2019-09-17T03:56:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia\",\"datePublished\":\"2019-09-17T03:56:45+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/\"},\"wordCount\":315,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1\",\"keywords\":[\"DIPLOMACY\",\"EnterpriseAM\",\"Ethiopia\",\"Nile Basin\",\"SPEED ROUND\",\"Sudan\"],\"articleSection\":[\"Speed Round\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/\",\"name\":\"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1\",\"datePublished\":\"2019-09-17T03:56:45+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/","og_locale":"en_US","og_type":"article","og_title":"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia","og_description":"GERD talks at a gridlock again? Ethiopia rejected last month Egypt\u2019s proposal for the timeline of filling the Grand Ethiopian Renaissance Dam\u2019s (GERD) reservoir, less than two weeks after Egypt handed it to the African country and neighboring Sudan, according to a note circulated by the Foreign Ministry to diplomats and seen by Reuters. Ethiopia [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2019-09-17T03:56:45+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia","datePublished":"2019-09-17T03:56:45+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/"},"wordCount":315,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1","keywords":["DIPLOMACY","EnterpriseAM","Ethiopia","Nile Basin","SPEED ROUND","Sudan"],"articleSection":["Speed Round"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/","url":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/","name":"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1","datePublished":"2019-09-17T03:56:45+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/17\/gerd-talks-at-a-deadlock-amid-wide-gap-between-egypt-and-ethiopia\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"GERD talks at a \u201cdeadlock\u201d amid wide gap between Egypt and Ethiopia"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2017\/12\/1315.png?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":628933,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/05\/17\/egypt-sudan-and-ethiopia-take-step-toward-breaking-deadlocked-gerd-talks\/","url_meta":{"origin":595128,"position":0},"title":"Egypt, Sudan and Ethiopia take step toward breaking deadlocked GERD talks?","author":"enterpriseam admin","date":"17 May 2018","format":false,"excerpt":"El Sisi\u2019s remarks on the GERD talks yesterday came as Egypt, Sudan and Ethiopia may have taken a step toward breaking a deadlock that had mired negotiations for several years now. The foreign ministers of Egypt and Ethiopia and Sudan\u2019s water resources minister signed a declaration in Addis Ababa on\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":636233,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/12\/27\/world-bank-to-join-gerd-talks-as-a-neutral-fourth-party\/","url_meta":{"origin":595128,"position":1},"title":"World Bank to join GERD talks as a neutral fourth party?","author":"enterpriseam admin","date":"27 December 2017","format":false,"excerpt":"World Bank to join GERD talks as a neutral fourth party mediator? Egypt, Ethiopia, and Sudan could call on the World Bank to help mediate talks over the Grand Ethiopian Renaissance Dam (GERD), Foreign Minister Sameh Shoukry suggested during a visit to Addis Ababa yesterday. Discussions between the three countries\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":595272,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/09\/22\/ethiopia-rejects-egypts-gerd-proposal\/","url_meta":{"origin":595128,"position":2},"title":"Ethiopia rejects Egypt\u2019s GERD proposal","author":"enterpriseam admin","date":"22 September 2019","format":false,"excerpt":"Ethiopia rejects Egypt\u2019s GERD proposal: Ethiopia\u2019s Foreign Ministry has dismissed Egypt\u2019s proposal for the Grand Ethiopian Renaissance Dam as \u201cdisrespectful\u201d and one that \u201cputs Ethiopia\u2019s sovereignty under question,\u201d according to the Ethiopian News Agency. Ministry spokesperson Nebiyat Getachew also said at a presser on Friday that the proposal would \u201ccomplicate\u201d\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":634584,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/01\/18\/egypt-ethiopia-agree-to-further-cooperation-to-sign-a-number-of-agreements-today\/","url_meta":{"origin":595128,"position":3},"title":"Egypt, Ethiopia agree to further cooperation, to sign a number of agreements today","author":"enterpriseam admin","date":"18 January 2018","format":false,"excerpt":"Egypt and Ethiopia are expected to ink a number of \u201cbilateral legal instruments\u201d today at a meeting between President Abdel Fattah El Sisi ad Ethiopian Prime Minister Hailemariam Desalegn in Cairo, Foreign Minister Sameh Shoukry said yesterday, according to an official statement. The two leaders are expected to meet one-on-one\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":592066,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/12\/25\/egypt-isnt-backing-down-from-its-gerd-filling-proposal-irrigation-ministry-says\/","url_meta":{"origin":595128,"position":4},"title":"Egypt isn\u2019t backing down from its GERD filling proposal, Irrigation Ministry says","author":"enterpriseam admin","date":"25 December 2019","format":false,"excerpt":"THIRST WATCH- Egypt isn\u2019t backing down from its GERD timeline proposal: Egypt has not withdrawn its proposal on the timeline for the filling of the Grand Ethiopian Renaissance Dam\u2019s (GERD) reservoirs and is holding its ground on its stance in the ongoing negotiations over the matter, according to an Irrigation\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":593290,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/24\/egypt-and-sudan-agree-to-ethiopias-proposed-gerd-timetable\/","url_meta":{"origin":595128,"position":5},"title":"Egypt and Sudan agree to Ethiopia\u2019s proposed GERD timetable","author":"enterpriseam admin","date":"24 November 2019","format":false,"excerpt":"Did we just make progress on GERD? Egypt and Sudan agree to Ethiopia\u2019s proposed timetable for dam filling: Egypt and Sudan have reportedly accepted Ethiopia\u2019s proposal to start filling the Grand Ethiopian Renaissance Dam\u2019s (GERD) reservoir in June 2020, when there will be high rainfall in the Ethiopian highlands, according\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/595128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=595128"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/595128\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/595113"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media\/595129"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=595128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=595128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=595128"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=595128"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=595128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}