{"id":592654,"date":"2019-11-03T04:12:23","date_gmt":"2019-11-03T04:12:23","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/"},"modified":"2019-11-03T04:12:23","modified_gmt":"2019-11-03T04:12:23","slug":"toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/","title":{"rendered":"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm"},"content":{"rendered":"<p>A consortium comprised of Orascom Construction (OC), Engie, and Toyota Tsusho Corporation began trial runs on its 250 MW wind farm in Ras Ghareb,<a href=\"https:\/\/alborsaanews.com\/2019\/10\/31\/1260772\">sources in the New and Renewable Energy Authority (NREA) told the local press<\/a>. The sources said that testing began two weeks ago, with full commercial operation expected to begin before the end of the year. The consortium <a href=\"https:\/\/enterprise.press\/stories\/2019\/02\/24\/oc-consortium-to-complete-250-mw-wind-farm-in-ras-gharib-two-months-ahead-of-schedule\/\">had announced it was on track<\/a> to complete the 250 MW wind farm by October, two months ahead of the 24-month construction schedule. Phase one of the build-own-operate project is expected to cost USD 312 mn, while phase two is estimated to be around USD 700 mn. The consortium inked the agreements for the project <a href=\"https:\/\/enterprise.press\/stories\/2018\/07\/19\/eetc-inks-contracts-for-500-mw-gulf-of-suez-wind-farm-with-orascom-construction-engie-toyota-tsusho\/\">in July of last year.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A consortium comprised of Orascom Construction (OC), Engie, and Toyota Tsusho Corporation began trial runs on its 250 MW wind farm in Ras Ghareb,sources in the New and Renewable Energy Authority (NREA) told the local press. The sources said that testing began two weeks ago, with full commercial operation expected to begin before the end [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[93,6330,72,367,363,4388,150,151,1231],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-592654","post","type-post","status-publish","format-standard","hentry","category-energy","tag-energy","tag-engie","tag-enterpriseam","tag-new-and-renewable-energy-authority","tag-orascom-construction","tag-ras-gharib","tag-renewable-energy","tag-renewables","tag-toyota","wpautop","entry"],"acf":{"mongo_id":"ece4373f-7cd8-4968-bc09-34dce9bacb5f","is_powered_by":true,"story_type":"1","photo_url":"","photo_position":"above","related_issue":[592631],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm\" \/>\n<meta property=\"og:description\" content=\"A consortium comprised of Orascom Construction (OC), Engie, and Toyota Tsusho Corporation began trial runs on its 250 MW wind farm in Ras Ghareb,sources in the New and Renewable Energy Authority (NREA) told the local press. The sources said that testing began two weeks ago, with full commercial operation expected to begin before the end [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-03T04:12:23+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm\",\"datePublished\":\"2019-11-03T04:12:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/\"},\"wordCount\":128,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"energy\",\"Engie\",\"EnterpriseAM\",\"New and Renewable Energy Authority\",\"Orascom Construction\",\"Ras Gharib\",\"renewable energy\",\"renewables\",\"Toyota\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/\",\"name\":\"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2019-11-03T04:12:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/","og_locale":"en_US","og_type":"article","og_title":"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm","og_description":"A consortium comprised of Orascom Construction (OC), Engie, and Toyota Tsusho Corporation began trial runs on its 250 MW wind farm in Ras Ghareb,sources in the New and Renewable Energy Authority (NREA) told the local press. The sources said that testing began two weeks ago, with full commercial operation expected to begin before the end [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2019-11-03T04:12:23+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm","datePublished":"2019-11-03T04:12:23+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/"},"wordCount":128,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["energy","Engie","EnterpriseAM","New and Renewable Energy Authority","Orascom Construction","Ras Gharib","renewable energy","renewables","Toyota"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/","url":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/","name":"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2019-11-03T04:12:23+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/03\/toyota-orascom-alliance-begins-trial-run-on-250-mw-ras-gharib-wind-farm\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Toyota-Orascom alliance begins trial run on 250 MW Ras Gharib wind farm"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":601268,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/02\/24\/oc-consortium-to-complete-250-mw-wind-farm-in-ras-gharib-two-months-ahead-of-schedule\/","url_meta":{"origin":592654,"position":0},"title":"OC consortium to complete 250 MW wind farm in Ras Gharib two months ahead of schedule","author":"enterpriseam admin","date":"24 February 2019","format":false,"excerpt":"A consortium comprised of Orascom Construction (OC), Engie, and Toyota Tsusho Corporation is on track to complete a 250 MW wind farm in Ras Gharib by October, two months ahead of the 24-month construction schedule, National Renewable Energy Authority (NREA) head Mohamed El Khayat tells local industry publication Power News.\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":627095,"url":"https:\/\/enterpriseam.com\/egypt\/2018\/07\/19\/eetc-inks-contracts-for-500-mw-gulf-of-suez-wind-farm-with-orascom-construction-engie-toyota-tsusho\/","url_meta":{"origin":592654,"position":1},"title":"EETC inks contracts for 500 MW Gulf of Suez wind farm with Orascom Construction, Engie, Toyota Tsusho","author":"enterpriseam admin","date":"19 July 2018","format":false,"excerpt":"Gov\u2019t inks contract with OC-led consortium for USD 650 mn, 500 MW Gulf of Suez wind farm: The Egyptian Electricity Transmission Company (EETC) signed a USD 650 mn agreement with a consortium comprised of Orascom Construction (OC), Engie, and Toyota Tsusho Corporation to build a 500 MW wind farm in\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":591488,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/12\/08\/oc-engie-toyota-inaugurate-262-5-mw-ras-ghareb-wind-farm\/","url_meta":{"origin":592654,"position":2},"title":"OC, Engie, Toyota inaugurate 262.5 MW Ras Ghareb wind farm","author":"enterpriseam admin","date":"8 December 2019","format":false,"excerpt":"Orascom Construction, Engie and Toyota have inaugurated their 262.5 MW Ras Ghareb wind farm after beginning commercial operations in October, Engie said in a press release. Ras Ghareb is Egypt\u2019s first private wind farm and is the first in the country to run under a build-own-operate (BOO) framework. Total investment\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":658458,"url":"https:\/\/enterpriseam.com\/egypt\/2025\/01\/12\/orascom-construction-engie-toyota-tsusho-and-eurus-energy-kick-off-commercial-operations-at-ras-ghareb-wind-farm\/","url_meta":{"origin":592654,"position":3},"title":"Orascom Construction, Engie, Toyota Tsusho, and Eurus Energy kick off commercial operations at Ras Ghareb wind farm","author":"enterpriseam admin","date":"12 January 2025","format":false,"excerpt":"The 650 MW wind farm is set to reduce carbon emissions by 1.3 mn tons annually","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2025\/1\/534.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":592732,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/11\/05\/oc-engie-toyota-consortiums-262-5-mw-ras-ghareb-wind-farm-ready-for-commercial-operation\/","url_meta":{"origin":592654,"position":4},"title":"OC-Engie-Toyota consortium\u2019s 262.5 MW Ras Ghareb wind farm ready for commercial operation","author":"enterpriseam admin","date":"5 November 2019","format":false,"excerpt":"OC-Engie-Toyota consortium\u2019s 262.5 MW Ras Ghareb wind farm ready for commercial operation ahead of schedule: A consortium comprised of Orascom Construction (OC), Engie, and Toyota Tsusho Corporation has fully completed the construction and commissioning of its 262.5 MW wind farm in Ras Ghareb 45 days ahead of schedule, according to\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":584857,"url":"https:\/\/enterpriseam.com\/egypt\/2023\/04\/06\/500-mw-gulf-of-suez-wind-farm-signs-financial-agreement\/","url_meta":{"origin":592654,"position":5},"title":"500-MW Gulf of Suez wind farm signs financial agreement","author":"enterpriseam admin","date":"6 April 2023","format":false,"excerpt":"The consortium behind the project reached financial close on Monday","rel":"","context":"In &quot;Also on our Radar&quot;","block_context":{"text":"Also on our Radar","link":"https:\/\/enterpriseam.com\/egypt\/category\/also-on-our-radar\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2023\/4\/278.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/592654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=592654"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/592654\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/592631"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=592654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=592654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=592654"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=592654"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=592654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}