{"id":567687,"date":"2020-12-03T04:15:30","date_gmt":"2020-12-03T04:15:30","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/"},"modified":"2020-12-03T04:15:30","modified_gmt":"2020-12-03T04:15:30","slug":"private-sector-to-bid-in-bumper-solar-tender","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/","title":{"rendered":"Private sector to bid in bumper solar tender"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-03\"><\/a> <strong>Private sector companies will be invited to bid in a new tender to construct <\/strong><strong>solar projects with a combined capacity of 550 MW<\/strong>, <a href=\"https:\/\/bit.ly\/3fZ53NL\">Al Mal<\/a> reports, citing sources in the Energy Ministry. The combined cost of the plants is expected to come at EGP 9.5 bn (c. USD 600 mn), the sources said without disclosing the plants\u2019 planned locations or the expected timeline for the tender. The plants will be implemented under a build-own-operate framework, they added.<\/p>\n<p>Meanwhile, <strong>Acwa Power has tapped Sterling and Wilson for construction works at its<\/strong><strong> Kom Ombo plant<\/strong>, <a href=\"https:\/\/alborsaanews.com\/2020\/12\/02\/1403073\">the local press<\/a>reports. The Saudi-based energy company had previously contracted India\u2019s Mahindra Susten for its <a href=\"https:\/\/www.acwapower.com\/en\/projects\/kom-ombo-pv\/\">USD 165 mn, 200 MW project<\/a>.<\/p>\n<p><strong>DIVE DEEPER<\/strong> with our three-part series on how covid-19 impacted Egypt\u2019s renewables sector: Tap \/ click here for <a href=\"https:\/\/enterprise.press\/hardhats\/covid-19-oil-price-volatility-impacting-egypts-renewable-energy-sector-part-1-lockdown\/\">Part 1<\/a>, <a href=\"https:\/\/enterprise.press\/hardhats\/covid-19-oil-price-volatility-impacting-egypts-renewable-energy-sector-part-2-oil-shock\/\">Part 2<\/a>, and <a href=\"https:\/\/enterprise.press\/hardhats\/covid-19-impacting-egypts-renewable-energy-sector-part-3-overcapacity-problem\/\">Part 3<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Private sector companies will be invited to bid in a new tender to construct solar projects with a combined capacity of 550 MW, Al Mal reports, citing sources in the Energy Ministry. The combined cost of the plants is expected to come at EGP 9.5 bn (c. USD 600 mn), the sources said without disclosing [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[93,72,151,368],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-567687","post","type-post","status-publish","format-standard","hentry","category-energy","tag-energy","tag-enterpriseam","tag-renewables","tag-sustainability","wpautop","entry"],"acf":{"mongo_id":"8f9c8264-a3d4-4dd2-8611-5b5f84ff7594","is_powered_by":true,"story_type":"1","photo_url":"","photo_position":"above","related_issue":[567679],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Private sector to bid in bumper solar tender - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Private sector to bid in bumper solar tender\" \/>\n<meta property=\"og:description\" content=\"Private sector companies will be invited to bid in a new tender to construct solar projects with a combined capacity of 550 MW, Al Mal reports, citing sources in the Energy Ministry. The combined cost of the plants is expected to come at EGP 9.5 bn (c. USD 600 mn), the sources said without disclosing [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-03T04:15:30+00:00\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Private sector to bid in bumper solar tender\",\"datePublished\":\"2020-12-03T04:15:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/\"},\"wordCount\":140,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"keywords\":[\"energy\",\"EnterpriseAM\",\"renewables\",\"sustainability\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/\",\"name\":\"Private sector to bid in bumper solar tender - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"datePublished\":\"2020-12-03T04:15:30+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Private sector to bid in bumper solar tender\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Private sector to bid in bumper solar tender - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/","og_locale":"en_US","og_type":"article","og_title":"Private sector to bid in bumper solar tender","og_description":"Private sector companies will be invited to bid in a new tender to construct solar projects with a combined capacity of 550 MW, Al Mal reports, citing sources in the Energy Ministry. The combined cost of the plants is expected to come at EGP 9.5 bn (c. USD 600 mn), the sources said without disclosing [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2020-12-03T04:15:30+00:00","author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Private sector to bid in bumper solar tender","datePublished":"2020-12-03T04:15:30+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/"},"wordCount":140,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"keywords":["energy","EnterpriseAM","renewables","sustainability"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/","url":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/","name":"Private sector to bid in bumper solar tender - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"datePublished":"2020-12-03T04:15:30+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2020\/12\/03\/private-sector-to-bid-in-bumper-solar-tender\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Private sector to bid in bumper solar tender"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":null,"featured_image_src_square":null,"author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":567478,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/01\/23\/alcazar-to-bid-for-450-mw-solar-wind-plants\/","url_meta":{"origin":567687,"position":0},"title":"Alcazar to bid for 450 MW solar, wind plants","author":"enterpriseam admin","date":"23 January 2020","format":false,"excerpt":"Dubai\u2019s Alcazar Energy is bidding for two renewable energy tenders \u2014 one wind plant and one solar plant \u2014 in the West Nile region with a combined capacity of 450 MW, unnamed sources told the local press. This comes a few days after unnamed sources said the company was looking\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":593955,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/10\/15\/uaes-al-nowais-offers-to-set-up-usd-700-mn-renewable-energy-plants-in-egypt\/","url_meta":{"origin":567687,"position":1},"title":"UAE\u2019s Al Nowais offers to set up USD 700 mn renewable energy plants in Egypt","author":"enterpriseam admin","date":"15 October 2019","format":false,"excerpt":"Al Nowais Investments is bidding to build USD 700 mn-worth of renewable energy plants in Egypt, sources from the Electricity Ministry said, according to Al Mal. A 500 MW wind power plant and a 50 MW solar plant could be built in undisclosed locations under a build-own-operate framework. The bid\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":549099,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/09\/04\/egypt-greece-plot-9-5-gw-renewables-project-plus-private-sector-solar-tender-coming\/","url_meta":{"origin":567687,"position":2},"title":"Egypt + Greece plot 9.5 GW renewables project. Plus: Private sector solar tender coming?","author":"enterpriseam admin","date":"4 September 2022","format":false,"excerpt":"Egypt and Greece are working on a plan to add 9.5 GW of renewable power generation capacity in Egypt for export to Greece, according to an Ittihadiya statement Thursday. The electricity would be generated by wind and solar plants and would be shipped across the Mediterranean via subsea cables, the\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/9\/107.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":577658,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/11\/30\/govt-reportedly-looking-to-tender-200-mw-worth-of-new-benban-solar-projects\/","url_meta":{"origin":567687,"position":3},"title":"Gov\u2019t reportedly looking to tender 200-MW worth of new Benban solar projects","author":"enterpriseam admin","date":"30 November 2022","format":false,"excerpt":"Among the other stories we\u2019re paying attention to this morning:ENERGY-A 200 MW solar tender in Benban? The New and Renewable Energy Authority is reportedly planning to issue a tender for one company to develop solar power plants with a combined production capacity of 200 MW across several land plots in\u2026","rel":"","context":"In &quot;Also on our Radar&quot;","block_context":{"text":"Also on our Radar","link":"https:\/\/enterpriseam.com\/egypt\/category\/also-on-our-radar\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/508.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":596275,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/08\/22\/electricity-ministry-to-offer-200-mws-solar-plants-in-benban-in-tender\/","url_meta":{"origin":567687,"position":4},"title":"Electricity Ministry to offer 200 MWs solar plants in Benban in tender","author":"enterpriseam admin","date":"22 August 2019","format":false,"excerpt":"The National Renewable Energy Authority is planning to tender solar power plants with a combined capacity of 200 MW in the Benban solar facility in Aswan, Electricity Ministry officials told Al Mal. The projects will require around EGP 3 bn of investments.","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":585598,"url":"https:\/\/enterpriseam.com\/egypt\/2023\/04\/26\/egyptian-indian-firms-to-team-up-on-usd-80-mn-pharma-materials-plant\/","url_meta":{"origin":567687,"position":5},"title":"Egyptian, Indian firms to team up on USD 80 mn pharma materials plant","author":"enterpriseam admin","date":"26 April 2023","format":false,"excerpt":"Egyptian and Indian firms will spend USD 80 mn on a pharma materials plant","rel":"","context":"In &quot;Also on our Radar&quot;","block_context":{"text":"Also on our Radar","link":"https:\/\/enterpriseam.com\/egypt\/category\/also-on-our-radar\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2023\/4\/818.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/567687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=567687"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/567687\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/567679"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=567687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=567687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=567687"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=567687"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=567687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}