{"id":558540,"date":"2021-08-16T04:02:01","date_gmt":"2021-08-16T04:02:01","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/"},"modified":"2021-08-16T04:02:01","modified_gmt":"2021-08-16T04:02:01","slug":"nrea-projects-energy-production-up-22-in-fy2020-2021","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/","title":{"rendered":"NREA projects\u2019 energy production up 22% in FY2020-2021"},"content":{"rendered":"<p><a id=\"tldr-story-06\" class=\"content-anchor\"><\/a> <strong>Egypt\u2019s renewable energy production from the New and Renewable Energy <\/strong><strong>Authority\u2019s (NREA) projects has increased over 22% y-o-y in FY2020-2021,<\/strong> reaching c. 4.5k megawatts \/ hour, the NREA <a href=\"http:\/\/www.nrea.gov.eg\/Media\/New\/1383\">announced<\/a> in a meeting last Tuesday, attributing the increase to improved operational efficiency and maintenance. Solar and wind projects affiliated with the NREA offset around 2.2k tons of CO2 emissions officials said, adding that the NREA runs projects with a collective capacity of 6k MW, of which 1.2k MW is owned by the NREA. Egypt\u2019s solar energy production <a href=\"https:\/\/enterprise.news\/egypt\/en\/news\/story\/a062b5bf-d77f-4523-a691-aae3c41e99aa\">was up 306% y-o-y<\/a> to 3.6k GWh in FY2019-2020 thanks to contributions from Aswan\u2019s Benban solar power park, which came online in December 2019.<\/p>\n<p>\u00a0<\/p>\n<p><em>CORRECTED ON 19 DECEMBER-<\/em><\/p>\n<p><em><span style=\"font-size: 1.6rem;\">Egypt's renewable energy production from NREA projects was up 22% in FY2020-21, not FY2021-22 as was previously noted.\u00a0<\/span><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Egypt\u2019s renewable energy production from the New and Renewable Energy Authority\u2019s (NREA) projects has increased over 22% y-o-y in FY2020-2021, reaching c. 4.5k megawatts \/ hour, the NREA announced in a meeting last Tuesday, attributing the increase to improved operational efficiency and maintenance. Solar and wind projects affiliated with the NREA offset around 2.2k tons [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":558541,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7207],"tags":[93,72],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-558540","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","tag-energy","tag-enterpriseam","wpautop","entry"],"acf":{"mongo_id":"8635e885-7a91-41df-9c98-219602126a54","is_powered_by":true,"story_type":"1","photo_url":"https:\/\/ent.news\/2021\/8\/176.jpg","photo_position":"above","related_issue":[558529],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>NREA projects\u2019 energy production up 22% in FY2020-2021 - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NREA projects\u2019 energy production up 22% in FY2020-2021\" \/>\n<meta property=\"og:description\" content=\"Egypt\u2019s renewable energy production from the New and Renewable Energy Authority\u2019s (NREA) projects has increased over 22% y-o-y in FY2020-2021, reaching c. 4.5k megawatts \/ hour, the NREA announced in a meeting last Tuesday, attributing the increase to improved operational efficiency and maintenance. Solar and wind projects affiliated with the NREA offset around 2.2k tons [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2021-08-16T04:02:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"NREA projects\u2019 energy production up 22% in FY2020-2021\",\"datePublished\":\"2021-08-16T04:02:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/\"},\"wordCount\":143,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1\",\"keywords\":[\"energy\",\"EnterpriseAM\"],\"articleSection\":[\"Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/\",\"name\":\"NREA projects\u2019 energy production up 22% in FY2020-2021 - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1\",\"datePublished\":\"2021-08-16T04:02:01+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"NREA projects\u2019 energy production up 22% in FY2020-2021\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"NREA projects\u2019 energy production up 22% in FY2020-2021 - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/","og_locale":"en_US","og_type":"article","og_title":"NREA projects\u2019 energy production up 22% in FY2020-2021","og_description":"Egypt\u2019s renewable energy production from the New and Renewable Energy Authority\u2019s (NREA) projects has increased over 22% y-o-y in FY2020-2021, reaching c. 4.5k megawatts \/ hour, the NREA announced in a meeting last Tuesday, attributing the increase to improved operational efficiency and maintenance. Solar and wind projects affiliated with the NREA offset around 2.2k tons [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2021-08-16T04:02:01+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"NREA projects\u2019 energy production up 22% in FY2020-2021","datePublished":"2021-08-16T04:02:01+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/"},"wordCount":143,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1","keywords":["energy","EnterpriseAM"],"articleSection":["Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/","url":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/","name":"NREA projects\u2019 energy production up 22% in FY2020-2021 - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1","datePublished":"2021-08-16T04:02:01+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2021\/08\/16\/nrea-projects-energy-production-up-22-in-fy2020-2021\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"NREA projects\u2019 energy production up 22% in FY2020-2021"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2021\/8\/176.jpg?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":597218,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/07\/18\/nrea-eetc-discuss-establishing-200-mw-solar-projects-in-zaafarana\/","url_meta":{"origin":558540,"position":0},"title":"NREA, EETC discuss establishing 200 MW solar projects in Zaafarana","author":"enterpriseam admin","date":"18 July 2019","format":false,"excerpt":"Discussions are underway between the New and Renewable Energy Authority (NREA) and the Egyptian Electricity Transmission Company (EETC) to set up 200 MW of solar projects in Zaafarana, the local press reports. The NREA will reallocate restored land plots, while the EETC will handle the process of selecting companies and\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":542729,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/01\/13\/sfe-eyes-renewable-energy-sub-fund\/","url_meta":{"origin":558540,"position":1},"title":"SFE eyes renewable energy sub-fund","author":"enterpriseam admin","date":"13 January 2022","format":false,"excerpt":"Our friends at the Sovereign Fund of Egypt is working to launch a renewable energy sub-fund this year as part of its plan to support the green transition, AlBorsa reports, citing sources it says have knowledge of the fund\u2019s plans. The Madbouly government is reportedly planning to transfer ownership of\u2026","rel":"","context":"In &quot;Green economy&quot;","block_context":{"text":"Green economy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/green-economy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/1\/153.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":637367,"url":"https:\/\/enterpriseam.com\/egypt\/2017\/11\/14\/nrea-to-tender-400-mw-solar-and-wind-projects-in-2018\/","url_meta":{"origin":558540,"position":2},"title":"NREA to tender 400 MW solar and wind projects in 2018","author":"enterpriseam admin","date":"14 November 2017","format":false,"excerpt":"The New and Renewable Energy Authority (NREA) is planning to tender solar and wind projects with a combined production capacity of 400 MW, NREA head Mohamed El Khayat tells Al Borsa. Among these projects is a 20 MW solar power plant that will be funded by the Japanese International Cooperation\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":577732,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/12\/04\/renewable-energy-authority-axes-50-mw-aswan-solar-plant\/","url_meta":{"origin":558540,"position":3},"title":"Renewable energy authority axes 50-MW Aswan solar plant","author":"enterpriseam admin","date":"4 December 2022","format":false,"excerpt":"One solar project just bit the dust: A 50-MW solar plant in Aswan has been called off by the New and Renewable Energy Authority (NREA) in a bid to reduce the government\u2019s financing burdens, Bloomberg Asharq reported, citing three unnamed officials from the authority. The Kuwait-based Arab Fund for Economic\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/12\/37.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":600597,"url":"https:\/\/enterpriseam.com\/egypt\/2019\/02\/04\/infinity-solars-1400-mw-projects-egypts-nrea-reviews-three-tender-bids\/","url_meta":{"origin":558540,"position":4},"title":"Infinity Solar\u2019s 1,400 MW projects, Egypt\u2019s NREA reviews three tender bids","author":"enterpriseam admin","date":"4 February 2019","format":false,"excerpt":"INVESTMENT WATCH- Infinity Solar in talks with int\u2019l banks for funding for 1,400 MW projects: Renewable energy player Infinity Solar is in negotiations with two international banks for up to USD 1.2 bn financing for projects with a total generation capacity of 1,400 MW, a company exec told Al Mal.\u2026","rel":"","context":"In &quot;Speed Round&quot;","block_context":{"text":"Speed Round","link":"https:\/\/enterpriseam.com\/egypt\/category\/speed-round\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]},{"id":574101,"url":"https:\/\/enterpriseam.com\/egypt\/2020\/08\/30\/nrea-signs-50-mw-zafarana-solar-plant-agreement-with-belectric\/","url_meta":{"origin":558540,"position":5},"title":"NREA signs 50 MW Zafarana solar plant agreement with Belectric","author":"enterpriseam admin","date":"30 August 2020","format":false,"excerpt":"The New and Renewable Energy Authority (NREA) has signed an agreement with Belectric to construct a 50 MW solar power plant in Zafarana, NREA head Mohamed El Khayyat told the local press. The project will be funded by the German Development Bank (KfW) but details on the total cost of\u2026","rel":"","context":"In &quot;Energy&quot;","block_context":{"text":"Energy","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/energy\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/internal\/536550.png?resize=350%2C200&ssl=1","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/558540","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=558540"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/558540\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/558529"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media\/558541"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=558540"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=558540"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=558540"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=558540"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=558540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}