{"id":543953,"date":"2022-02-27T04:10:57","date_gmt":"2022-02-27T04:10:57","guid":{"rendered":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/"},"modified":"2022-02-27T04:10:57","modified_gmt":"2022-02-27T04:10:57","slug":"siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/","title":{"rendered":"Siemens-led consortium set to sign on second + third high-speed rail lines next month"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-04\"><\/a><strong> Contracts for second + third lines of Egypt\u2019s high-speed railway to <\/strong><strong>be signed in March:<\/strong> The Transport Ministry and the consortium of Siemens Mobility, Orascom Construction and Arab Contractors tasked with building Egypt\u2019s first high-speed rail line are next month set to sign final contracts for the second and third lines of the project, after completing \u201cmarathon negotiations that lasted for several months,\u201d according to a cabinet <a href=\"https:\/\/www.facebook.com\/EgyptianCabinet\/posts\/345826554254438\">statement<\/a>. The second and third lines of the 1.7k-km high-speed rail network will connect 6th of October with Aswan, and Luxor to Hurghada via Qena and Safaga.<\/p>\n<p><strong>Background: <\/strong>The three-line high-speed rail project is set to link Cairo, Aswan, the North Coast and the Red Sea. The Siemens \/ Orascom \/ Arab Contractors consortium was<a href=\"https:\/\/enterprise.news\/egypt\/en\/news\/story\/13c77944-a194-421e-b52d-c3ab09523df6\">last year contracted<\/a> to design, install and maintain the first phase of the line, which runs 660 km between Ain Sokhna, Alexandria and Marsa Matrouh and is set to be completed by 2023. Passenger trains on the line will travel at up to 250 km\/hour, reducing journey times by around 50%.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contracts for second + third lines of Egypt\u2019s high-speed railway to be signed in March: The Transport Ministry and the consortium of Siemens Mobility, Orascom Construction and Arab Contractors tasked with building Egypt\u2019s first high-speed rail line are next month set to sign final contracts for the second and third lines of the project, after [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":543954,"comment_status":"closed","ping_status":"open","sticky":false,"template":"single-feature.php","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[7261],"tags":[833,72,1088,363,1087,207],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-543953","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-transport","tag-arab-contractors","tag-enterpriseam","tag-high-speed-rail","tag-orascom-construction","tag-siemens-mobility","tag-transport","wpautop","entry"],"acf":{"mongo_id":"1d568e7c-55b5-4ee5-b9a5-310ed69e14d3","is_powered_by":true,"story_type":"1","photo_url":"https:\/\/ent.news\/2022\/2\/371.jpg","photo_position":"above","related_issue":[543943],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Siemens-led consortium set to sign on second + third high-speed rail lines next month - EnterpriseAM Egypt<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Siemens-led consortium set to sign on second + third high-speed rail lines next month\" \/>\n<meta property=\"og:description\" content=\"Contracts for second + third lines of Egypt\u2019s high-speed railway to be signed in March: The Transport Ministry and the consortium of Siemens Mobility, Orascom Construction and Arab Contractors tasked with building Egypt\u2019s first high-speed rail line are next month set to sign final contracts for the second and third lines of the project, after [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/\" \/>\n<meta property=\"og:site_name\" content=\"EnterpriseAM Egypt\" \/>\n<meta property=\"article:published_time\" content=\"2022-02-27T04:10:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Siemens-led consortium set to sign on second + third high-speed rail lines next month\",\"datePublished\":\"2022-02-27T04:10:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/\"},\"wordCount\":181,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1\",\"keywords\":[\"Arab Contractors\",\"EnterpriseAM\",\"high-speed rail\",\"Orascom Construction\",\"Siemens Mobility\",\"transport\"],\"articleSection\":[\"Transport\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/\",\"name\":\"Siemens-led consortium set to sign on second + third high-speed rail lines next month - EnterpriseAM Egypt\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1\",\"datePublished\":\"2022-02-27T04:10:57+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/egypt\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Siemens-led consortium set to sign on second + third high-speed rail lines next month\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#website\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"name\":\"EnterpriseAM\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#organization\",\"name\":\"EnterpriseAM\",\"url\":\"https:\/\/enterpriseam.com\/egypt\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/240894.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/240894.svg\",\"caption\":\"EnterpriseAM\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Siemens-led consortium set to sign on second + third high-speed rail lines next month - EnterpriseAM Egypt","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/","og_locale":"en_US","og_type":"article","og_title":"Siemens-led consortium set to sign on second + third high-speed rail lines next month","og_description":"Contracts for second + third lines of Egypt\u2019s high-speed railway to be signed in March: The Transport Ministry and the consortium of Siemens Mobility, Orascom Construction and Arab Contractors tasked with building Egypt\u2019s first high-speed rail line are next month set to sign final contracts for the second and third lines of the project, after [&hellip;]","og_url":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/","og_site_name":"EnterpriseAM Egypt","article_published_time":"2022-02-27T04:10:57+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Siemens-led consortium set to sign on second + third high-speed rail lines next month","datePublished":"2022-02-27T04:10:57+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/"},"wordCount":181,"publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1","keywords":["Arab Contractors","EnterpriseAM","high-speed rail","Orascom Construction","Siemens Mobility","transport"],"articleSection":["Transport"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/","url":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/","name":"Siemens-led consortium set to sign on second + third high-speed rail lines next month - EnterpriseAM Egypt","isPartOf":{"@id":"https:\/\/enterpriseam.com\/egypt\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1","datePublished":"2022-02-27T04:10:57+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/egypt\/2022\/02\/27\/siemens-led-consortium-set-to-sign-on-second-third-high-speed-rail-lines-next-month\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/egypt\/"},{"@type":"ListItem","position":2,"name":"Siemens-led consortium set to sign on second + third high-speed rail lines next month"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/egypt\/#website","url":"https:\/\/enterpriseam.com\/egypt\/","name":"EnterpriseAM","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/egypt\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/egypt\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/egypt\/#organization","name":"EnterpriseAM","url":"https:\/\/enterpriseam.com\/egypt\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/240894.svg","contentUrl":"https:\/\/ent.news\/internal\/240894.svg","caption":"EnterpriseAM"},"image":{"@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/egypt\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/egypt\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2022\/2\/371.jpg?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":557307,"url":"https:\/\/enterpriseam.com\/egypt\/2021\/09\/14\/siemens-could-sign-contracts-for-second-third-high-speed-rail-lines-within-2-months\/","url_meta":{"origin":543953,"position":0},"title":"Siemens could sign contracts for second, third high-speed rail lines within 2 months","author":"enterpriseam admin","date":"14 September 2021","format":false,"excerpt":"Siemens will sign up to USD 6 bn in contracts to implement the second and third lines of Egypt\u2019s high-speed rail project within the next two months, Amwal Alghad reports, citing sources at the Transport Ministry. The ministry has reportedly reached a preliminary agreement with the German conglomerate on the\u2026","rel":"","context":"In &quot;Transport&quot;","block_context":{"text":"Transport","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/transport\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2021\/9\/186.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":546766,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/05\/29\/orascom-construction-siemens-and-arab-contractors-consortium-ink-multi-bn-usd-high-speed-rail-contract\/","url_meta":{"origin":543953,"position":1},"title":"Orascom Construction, Siemens and Arab Contractors consortium ink multi-bn USD high-speed rail contract","author":"enterpriseam admin","date":"29 May 2022","format":false,"excerpt":"Siemens Mobility, Orascom Construction (OC) and Arab Contractors have signed a contract with the government for the second phase of the planned 2k-km high-speed rail line, Siemens and our friends at OC said in statements yesterday (here and here, pdf). The consortium will design, install, commission and maintain the line\u2026","rel":"","context":"In &quot;Transport&quot;","block_context":{"text":"Transport","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/transport\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/5\/376.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":556999,"url":"https:\/\/enterpriseam.com\/egypt\/2021\/09\/02\/from-sokhna-to-alexandria-in-a-jiffy\/","url_meta":{"origin":543953,"position":2},"title":"From Sokhna to Alexandria in a jiffy","author":"enterpriseam admin","date":"2 September 2021","format":false,"excerpt":"Moving between the Red Sea and the Med will soon be easier and faster after the government signed yesterday a USD 4.5 bn contract to build Egypt\u2019s first high-speed rail line. A consortium including Siemens Mobility, Orascom Construction and Arab Contractors agreed with the state-owned National Authority for Tunnels (NAT)\u2026","rel":"","context":"In &quot;Transport&quot;","block_context":{"text":"Transport","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/transport\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2021\/9\/25.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":581816,"url":"https:\/\/enterpriseam.com\/egypt\/2023\/02\/26\/nge-on-board-to-lay-sokhna-alex-high-speed-rail-link\/","url_meta":{"origin":543953,"position":3},"title":"NGE on board to lay Sokhna-Alex high-speed rail link","author":"enterpriseam admin","date":"26 February 2023","format":false,"excerpt":"France\u2019s NGE to build Sokhna-Alexandria section of high-speed rail: French construction firm NGE and its subsidiary TSO have signed a contract to construct half of the first phase of Egypt\u2019s high-speed rail line, the company said in a statement Thursday. TSO will be responsible for laying the track for a\u2026","rel":"","context":"In &quot;Transport&quot;","block_context":{"text":"Transport","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/transport\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2023\/2\/egypt-train-1600px.jpeg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":577095,"url":"https:\/\/enterpriseam.com\/egypt\/2022\/11\/09\/deutsche-bahn-elsewedy-sign-eur-1-bn-contract-to-operate-high-speed-rail\/","url_meta":{"origin":543953,"position":4},"title":"Deutsche Bahn, Elsewedy sign EUR 1 bn contract to operate high-speed rail","author":"enterpriseam admin","date":"9 November 2022","format":false,"excerpt":"One step closer to high-speed rail: Deutsche Bahn and El Sewedy Electric have signed a contract with the Madbouly government to manage and operate the first line of the planned high-speed rail network, the German railway operator, Elsewedy Electric (pdf) and the Transport Ministry said yesterday. The agreement is worth\u2026","rel":"","context":"In &quot;Transport&quot;","block_context":{"text":"Transport","link":"https:\/\/enterpriseam.com\/egypt\/category\/industries\/transport\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/153.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":556187,"url":"https:\/\/enterpriseam.com\/egypt\/2021\/10\/14\/the-buildout-of-our-fastest-ever-rail-line-is-on-the-fast-track\/","url_meta":{"origin":543953,"position":5},"title":"The buildout of our fastest-ever rail line is on the fast track","author":"enterpriseam admin","date":"14 October 2021","format":false,"excerpt":"Our first high-speed rail line is \u201con the fast track\u201d \u2014 but it\u2019s unclear exactly when it will be operational: The first high-speed rail line in Egypt, which will connect the Red Sea to the Mediterranean, could take as long as 10 years to complete, but the project is \u201con\u2026","rel":"","context":"In &quot;INFRASTRUCTURE WATCH&quot;","block_context":{"text":"INFRASTRUCTURE WATCH","link":"https:\/\/enterpriseam.com\/egypt\/category\/infrastructure-watch\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/ent.news\/2021\/10\/159.jpg?fit=%2C&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]}],"_links":{"self":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/543953","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/comments?post=543953"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/posts\/543953\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/issue\/543943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media\/543954"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/media?parent=543953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/categories?post=543953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/tags?post=543953"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/brand?post=543953"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/egypt\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=543953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}