{"id":79808,"date":"2023-10-03T02:43:25","date_gmt":"2023-10-03T02:43:25","guid":{"rendered":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/"},"modified":"2023-10-03T02:43:25","modified_gmt":"2023-10-03T02:43:25","slug":"dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/","title":{"rendered":"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-01\"><\/a> <strong>Another step forward for Al Maktoum solar park: <\/strong>The Dubai Electricity and Water Authority (Dewa) has commissioned the 200 MW second unit of the parabolic basin complex in Mohammed bin Rashid Al Maktoum solar park\u2019s fourth phase, Dewa said in a <a href=\"https:\/\/www.dfm.ae\/the-exchange\/news-disclosures\/disclosures\/0967fd3f-f60b-47e7-afff-34cc9204eb7f\">disclosure (pdf)<\/a> to the DFM yesterday. The solar park is the <a href=\"https:\/\/www.mbrsic.ae\/en\/about\/mohammed-bin-rashid-al-maktoum-solar-park\/\">world\u2019s largest single-site solar park<\/a>using the IPP model with a planned production capacity of 5 GW by 2030 and investments totalling AED 50 bn (c. USD 13.6 bn).<\/p>\n<p><strong>A big boost for the solar park\u2019s capacity:<\/strong> The commissioning of the second unit in the fourth phase helped boost the solar park\u2019s production capacity to 2.6 GW and Dewa\u2019s total production capacity to 15.1 GW, according to the statement.<\/p>\n<p><strong>About the fourth phase: <\/strong>The 950 MW fourth phase \u2014 which is being built by Dewa and a KSA Acwa Power-led consortium that includes the Chinese Silk Road Fund \u2014 is the largest single-site project in the world that brings together Concentrated Solar Power (CSP) and photovoltaic technologies, Dewa said. The phase uses the Independent Power Producer (IPP) model with investments of up to AED c.16 bn. It is expected to power 320k households and slash carbon emissions by 1.6 mn tonnes annually, Dewa added.<\/p>\n<p><strong>And that\u2019s not all:<\/strong> The fourth phase utilizes three hybrid technologies to produce clean energy: 600 MW from a parabolic basin complex comprising three units of 200 MW each, 100 MW from the world\u2019s tallest solar power tower, and 250 MW from PV solar panels. Around 717 MW have been commissioned from the fourth phase, which will have the world\u2019s largest thermal storage capacity of 15 hours, allowing 24-7 solar energy availability.<\/p>\n<p><strong>Third unit is nearing completion: <\/strong>The third unit of 200 MW from the parabolic basin complex and 33 MW from PC solar panels at the fourth phase are 87.1% complete, according to the statement.<\/p>\n<p><strong>It\u2019s been a busy summer for the solar park:<\/strong> In August, Dewa selected state-owned renewables firm Masdar to <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/9240b002-affa-47ce-b989-011960533c9a\">build and operate<\/a> its 1.8 GW sixth phase of the Mohammed bin Rashid Al Maktoum solar park, beating Saudi Arabia\u2019s Acwa Power for the bid. The full investment ticket for the upcoming phase is AED 5.5 bn (c. USD 1.5 bn), and it is scheduled to become operational in stages between 4Q 2024 and 2026.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Another step forward for Al Maktoum solar park: The Dubai Electricity and Water Authority (Dewa) has commissioned the 200 MW second unit of the parabolic basin complex in Mohammed bin Rashid Al Maktoum solar park\u2019s fourth phase, Dewa said in a disclosure (pdf) to the DFM yesterday. The solar park is the world\u2019s largest single-site [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":79809,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[171],"tags":[184,154,11,160,427,88,94],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-79808","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar","tag-acwa-power","tag-dewa","tag-enterpriseclimate","tag-masdar","tag-mohammed-bin-rashid-al-maktoum-solar-park","tag-renewables","tag-solar","wpautop","entry"],"acf":{"mongo_id":"5ac95929-98fc-42aa-8fa4-cc0a9c07f511","is_powered_by":true,"story_type":"1","photo_url":"https:\/\/ent.news\/2023\/10\/653.jpeg","photo_position":"above","related_issue":[79803],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park - Climate<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park\" \/>\n<meta property=\"og:description\" content=\"Another step forward for Al Maktoum solar park: The Dubai Electricity and Water Authority (Dewa) has commissioned the 200 MW second unit of the parabolic basin complex in Mohammed bin Rashid Al Maktoum solar park\u2019s fourth phase, Dewa said in a disclosure (pdf) to the DFM yesterday. The solar park is the world\u2019s largest single-site [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/\" \/>\n<meta property=\"og:site_name\" content=\"Climate\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-03T02:43:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park\",\"datePublished\":\"2023-10-03T02:43:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/\"},\"wordCount\":384,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1\",\"keywords\":[\"ACWA Power\",\"DEWA\",\"EnterpriseClimate\",\"Masdar\",\"Mohammed bin Rashid Al Maktoum Solar Park\",\"renewables\",\"SOLAR\"],\"articleSection\":[\"SOLAR\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/\",\"url\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/\",\"name\":\"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park - Climate\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1\",\"datePublished\":\"2023-10-03T02:43:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/climate\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"name\":\"Climate\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\",\"name\":\"Climate\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/25470.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/25470.svg\",\"caption\":\"Climate\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park - Climate","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/","og_locale":"en_US","og_type":"article","og_title":"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park","og_description":"Another step forward for Al Maktoum solar park: The Dubai Electricity and Water Authority (Dewa) has commissioned the 200 MW second unit of the parabolic basin complex in Mohammed bin Rashid Al Maktoum solar park\u2019s fourth phase, Dewa said in a disclosure (pdf) to the DFM yesterday. The solar park is the world\u2019s largest single-site [&hellip;]","og_url":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/","og_site_name":"Climate","article_published_time":"2023-10-03T02:43:25+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park","datePublished":"2023-10-03T02:43:25+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/"},"wordCount":384,"publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1","keywords":["ACWA Power","DEWA","EnterpriseClimate","Masdar","Mohammed bin Rashid Al Maktoum Solar Park","renewables","SOLAR"],"articleSection":["SOLAR"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/","url":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/","name":"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park - Climate","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1","datePublished":"2023-10-03T02:43:25+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/climate\/2023\/10\/03\/dewa-commissions-200-mw-second-unit-in-fourth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/climate\/"},{"@type":"ListItem","position":2,"name":"Dewa commissions 200 MW second unit in fourth phase of UAE\u2019s Al Maktoum solar park"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/climate\/#website","url":"https:\/\/enterpriseam.com\/climate\/","name":"Climate","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/climate\/#organization","name":"Climate","url":"https:\/\/enterpriseam.com\/climate\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/25470.svg","contentUrl":"https:\/\/ent.news\/internal\/25470.svg","caption":"Climate"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2023\/10\/653.jpeg?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/pgVl2y-kLe","_links":{"self":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/79808","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/comments?post=79808"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/79808\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/issue\/79803"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media\/79809"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media?parent=79808"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/categories?post=79808"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/tags?post=79808"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/brand?post=79808"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=79808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}