{"id":79163,"date":"2023-08-28T01:00:48","date_gmt":"2023-08-28T01:00:48","guid":{"rendered":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/"},"modified":"2023-08-28T01:00:48","modified_gmt":"2023-08-28T01:00:48","slug":"first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/","title":{"rendered":"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-02\"><\/a><strong>The first phase of Iran\u2019s state-owned USD 1 bn Mehdiabad lead, zinc and barite mine <\/strong><strong>complex is in its final stages of construction<\/strong>, <a href=\"https:\/\/www.tasnimnews.com\/en\/news\/2023\/08\/26\/2947248\/major-zinc-processing-plant-to-be-launched-in-iran\">Tasnim News Agency<\/a> reported on Saturday. The mine will produce 800k tons of zinc concentrate and 80k tons of lead-silver concentrate \u2014 two crucial components needed in battery manufacturing. The first phase cost USD 300 mn and a scheduled date for operational launch was not disclosed.<\/p>\n<p><strong>About the complex:<\/strong> The complex is home to 700 mn tons of lead and zinc reserves, about 170 mn tons of which are extractable, making it the second largest reserve in the world and the \u200b\u200blargest lead and zinc processing factory in the region, the news outlet said, citing mine director Hamid Hemayat.<\/p>\n<p><strong>The complex will be getting its water from the Yazd Wastewater Treatment Plant: <\/strong>Iran\u2019s largest wastewater conveyance project will supply water to the Mehdiabad plant through a 100 km pipeline from Yazd Wastewater Treatment Plant, Hemayat told the news outlet.<\/p>\n<p><strong>REMEMBER- Zinc and lead are critical minerals for the energy transition:<\/strong> While commercial EV batteries are lithium based, research has recently been taking place into <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/d3355cf4-47d7-4396-9054-429c3d4f2f77\">redox flow batteries<\/a>, of which zinc-bromide is a component. Compared to lithium-ion batteries, zinc-based batteries have low flammability and high energy densities (i.e longer runtime), according to <a href=\"https:\/\/www.ga.gov.au\/scientific-topics\/minerals\/mineral-resources-and-advice\/australian-resource-reviews\/zinc-lead-silver\">Australia\u2019s geoscience agency<\/a>. Those advantages have led to the development of zinc-air, zinc-nickel, zinc-silver, zinc-water, and zinc-gel batteries. Disadvantages of zinc batteries include difficulties in recharging, high costs, and lower power output (zinc-gel). 80% of global lead demand comes from EV battery manufacturing.<\/p>\n<p><strong>IN OTHER MINING NEWS-<\/strong> <strong>A nickel mine in Oman could be among the world\u2019s largest: <\/strong>The Omani nickel-laterite mine <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/7c50a9d0-538e-4660-8285-2a3b26ae7dae\">recently awarded<\/a> to UK-based strategic minerals miner <a href=\"https:\/\/knightsbay.com\/\">Knights Bay<\/a> for development could be among the world\u2019s largest, <a href=\"https:\/\/www.omanobserver.om\/article\/1141813\/business\/oman-nickel-mine-could-rank-among-worlds-largest\">Oman Daily Observer<\/a> reported last week. Covering an area of 1.4k square kilometers in the Wilayat of Ibra in North Al Sharqiyah governorate, the mine reportedly holds deposits of other strategic minerals including cobalt, chrome, and iron ore. Knights Bay is planning a full production capacity of 200k tons per annum beginning from 2030 and is in talks with several investors to fund the rest of the project to the tune of around USD 5.5 bn, Director of Investor Relations Max Beck told the news outlet.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first phase of Iran\u2019s state-owned USD 1 bn Mehdiabad lead, zinc and barite mine complex is in its final stages of construction, Tasnim News Agency reported on Saturday. The mine will produce 800k tons of zinc concentrate and 80k tons of lead-silver concentrate \u2014 two crucial components needed in battery manufacturing. The first phase [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":79164,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[373],"tags":[107,11,65,1803,197,196,296],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-79163","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mining","tag-critical-minerals","tag-enterpriseclimate","tag-iran","tag-lead","tag-minerals","tag-mining","tag-wastewater-treatment","wpautop","entry"],"acf":{"mongo_id":"5fa3c44c-4255-48ef-a7c4-fe4023301a38","is_powered_by":true,"story_type":"1","photo_url":"https:\/\/ent.news\/2023\/8\/3233.jpg","photo_position":"above","related_issue":[79156],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development - Climate<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development\" \/>\n<meta property=\"og:description\" content=\"The first phase of Iran\u2019s state-owned USD 1 bn Mehdiabad lead, zinc and barite mine complex is in its final stages of construction, Tasnim News Agency reported on Saturday. The mine will produce 800k tons of zinc concentrate and 80k tons of lead-silver concentrate \u2014 two crucial components needed in battery manufacturing. The first phase [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/\" \/>\n<meta property=\"og:site_name\" content=\"Climate\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-28T01:00:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development\",\"datePublished\":\"2023-08-28T01:00:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/\"},\"wordCount\":392,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1\",\"keywords\":[\"critical minerals\",\"EnterpriseClimate\",\"Iran\",\"lead\",\"minerals\",\"MINING\",\"wastewater treatment\"],\"articleSection\":[\"MINING\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/\",\"url\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/\",\"name\":\"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development - Climate\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1\",\"datePublished\":\"2023-08-28T01:00:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/climate\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"name\":\"Climate\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\",\"name\":\"Climate\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/25470.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/25470.svg\",\"caption\":\"Climate\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development - Climate","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/","og_locale":"en_US","og_type":"article","og_title":"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development","og_description":"The first phase of Iran\u2019s state-owned USD 1 bn Mehdiabad lead, zinc and barite mine complex is in its final stages of construction, Tasnim News Agency reported on Saturday. The mine will produce 800k tons of zinc concentrate and 80k tons of lead-silver concentrate \u2014 two crucial components needed in battery manufacturing. The first phase [&hellip;]","og_url":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/","og_site_name":"Climate","article_published_time":"2023-08-28T01:00:48+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development","datePublished":"2023-08-28T01:00:48+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/"},"wordCount":392,"publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1","keywords":["critical minerals","EnterpriseClimate","Iran","lead","minerals","MINING","wastewater treatment"],"articleSection":["MINING"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/","url":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/","name":"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development - Climate","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1","datePublished":"2023-08-28T01:00:48+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/28\/first-phase-of-usd-1-bn-iran-zinc-and-lead-processing-plant-in-final-stages-of-development\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/climate\/"},{"@type":"ListItem","position":2,"name":"First phase of USD 1 bn Iran zinc and lead processing plant in final stages of development"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/climate\/#website","url":"https:\/\/enterpriseam.com\/climate\/","name":"Climate","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/climate\/#organization","name":"Climate","url":"https:\/\/enterpriseam.com\/climate\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/25470.svg","contentUrl":"https:\/\/ent.news\/internal\/25470.svg","caption":"Climate"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2023\/8\/3233.jpg?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/pgVl2y-kAP","_links":{"self":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/79163","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/comments?post=79163"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/79163\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/issue\/79156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media\/79164"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media?parent=79163"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/categories?post=79163"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/tags?post=79163"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/brand?post=79163"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=79163"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}