{"id":78955,"date":"2023-08-14T01:00:49","date_gmt":"2023-08-14T01:00:49","guid":{"rendered":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/"},"modified":"2023-08-14T01:00:49","modified_gmt":"2023-08-14T01:00:49","slug":"masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/","title":{"rendered":"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-01\"><\/a> <strong>UAE taps Masdar to build sixth phase of Al Maktoum solar park:<\/strong> The Dubai Electricity and Water Authority (Dewa) has selected the UAE\u2019s Masdar to build and operate its 1.8 GW sixth phase of the Mohammed bin Rashid Al Maktoum solar park beating <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/319301a9-69d6-4fc8-8e6a-4987d9182c03\">Saudi Arabia\u2019s Acwa Power<\/a> for the bid, the <a href=\"https:\/\/mediaoffice.ae\/en\/news\/2023\/August\/13-08\/DEWA-selects-Preferred-Bidder-for\">Dubai Media Office<\/a> reports. The full investment ticket for the upcoming phase is AED 5.5 bn (c. USD 1.5 bn), and it is scheduled to become operational in stages between 4Q 2024 and 2026.<\/p>\n<p><strong>The lowest price wins: <\/strong>Masdar\u2019s bid to sell the energy generated by the sixth phase was <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/319301a9-69d6-4fc8-8e6a-4987d9182c03\">the<\/a><a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/319301a9-69d6-4fc8-8e6a-4987d9182c03\">lowest bid Dewa<\/a> has received thus far at USD 0.0162 per kWh, beating Acwa Power\u2019s fifth phase pricing of USD 0.0170 per kWh. Acwa Power\u2019s competing bid for the sixth phase was not disclosed.<\/p>\n<p><strong>The upcoming phase will push total capacity to 4.2 GW:<\/strong> Once the sixth phase is completed, the park\u2019s total production capacity will go from the current 2.4 GW \u2014 reached in June after the inauguration of the fifth phase \u2014 to 4.2 GW. This leaves 800 MW remaining to complete the <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/7d04bf56-c205-41f8-8e05-d93d8064cd98\">world\u2019s largest single-site solar park<\/a> using the IPP model.<\/p>\n<p><strong>A second play for Masdar:<\/strong> A Masdar-led consortium developed the <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/bc3db30e-721f-418d-afea-36acddd5e39b\">800 MW third phase<\/a> of the solar park in partnership with France's EDF, selling at a price of <a href=\"https:\/\/www.mbrsic.ae\/en\/about\/mohammed-bin-rashid-al-maktoum-solar-park\/\">USD 0.0299 per kWh<\/a>, which was the lowest price secured by Dewa at the time. Acwa Power is still ahead of Masdar in the number of bids won, having developed the second, fourth, and fifth phases of the park.<\/p>\n<p><strong>IN OTHER MASDAR NEWS- The company is emerging as a risk taker in <\/strong><strong>climate-challenged <\/strong><strong>economies: <\/strong>Masdar\u2019s recent <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/53701f25-7e73-45d7-abeb-3a954978d785\">debut green bond issuance<\/a> will allow it to \u201ctap into a completely new pool of liquidity for greenfield, wind, solar and battery projects\u2026in developing or climate-challenged economies,\u201d CFO Niall Hannigan told <a href=\"https:\/\/www.spglobal.com\/commodityinsights\/en\/market-insights\/latest-news\/electric-power\/080923-interview-masdars-green-bonds-to-help-address-climate-inequality\">S&P Global Commodity Insights<\/a> in an interview last week. Hannigan stressed that the liquidity would not be subjected to the usual risk of being put into developing economies. \"That's us using the green bond and taking money to markets it otherwise would not get to,\" he said.<\/p>\n<p><strong>And there\u2019s some strategic diversification on deck:<\/strong> It aims to produce 1 mn mt of renewable hydrogen by 2030, first in the UAE under an agreement with France\u2019s Engie and global hubs like Egypt for exports into Europe and cooperation in the continent itself, including BP in the UK. The Gulf represents a \u201chuge market\u201d for the company, with generation capacity for green hydrogen in the UAE and Saudi Arabia covered, Hannigan said. MENA is also a key region of interest, with its joint venture with Infinity Power helping it acquire a platform with projects in Egypt, South Africa, and Senegal, he added.<\/p>\n<p><strong>Battery storage in mind:<\/strong> Masdar is also interested in battery storage projects, targeting 1 GW plus of battery storage through <a href=\"https:\/\/news.masdar.ae\/en\/press-Release?News\/2022\/10\/25\/10\/25\/Masdar-Acquires-Arlington-Energy-to-Advance\">Masdar Arlington<\/a>, Hannigan said. He revealed that final investment decisions would be made later in 2023 on the company\u2019s first UK battery projects, which upon operations would be managed using Octopus\u2019 Kraken technology platform.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>UAE taps Masdar to build sixth phase of Al Maktoum solar park: The Dubai Electricity and Water Authority (Dewa) has selected the UAE\u2019s Masdar to build and operate its 1.8 GW sixth phase of the Mohammed bin Rashid Al Maktoum solar park beating Saudi Arabia\u2019s Acwa Power for the bid, the Dubai Media Office reports. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78956,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[171],"tags":[11,160,88,94,42,52],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-78955","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solar","tag-enterpriseclimate","tag-masdar","tag-renewables","tag-solar","tag-solar-energy","tag-uae","wpautop","entry"],"acf":{"mongo_id":"9240b002-affa-47ce-b989-011960533c9a","is_powered_by":true,"story_type":"1","photo_url":"https:\/\/ent.news\/2021\/2\/2059.jpg","photo_position":"above","related_issue":[78950],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park - Climate<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park\" \/>\n<meta property=\"og:description\" content=\"UAE taps Masdar to build sixth phase of Al Maktoum solar park: The Dubai Electricity and Water Authority (Dewa) has selected the UAE\u2019s Masdar to build and operate its 1.8 GW sixth phase of the Mohammed bin Rashid Al Maktoum solar park beating Saudi Arabia\u2019s Acwa Power for the bid, the Dubai Media Office reports. [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/\" \/>\n<meta property=\"og:site_name\" content=\"Climate\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-14T01:00:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park\",\"datePublished\":\"2023-08-14T01:00:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/\"},\"wordCount\":527,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1\",\"keywords\":[\"EnterpriseClimate\",\"Masdar\",\"renewables\",\"SOLAR\",\"solar energy\",\"UAE\"],\"articleSection\":[\"SOLAR\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/\",\"url\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/\",\"name\":\"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park - Climate\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1\",\"datePublished\":\"2023-08-14T01:00:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/climate\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"name\":\"Climate\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\",\"name\":\"Climate\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/25470.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/25470.svg\",\"caption\":\"Climate\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park - Climate","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/","og_locale":"en_US","og_type":"article","og_title":"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park","og_description":"UAE taps Masdar to build sixth phase of Al Maktoum solar park: The Dubai Electricity and Water Authority (Dewa) has selected the UAE\u2019s Masdar to build and operate its 1.8 GW sixth phase of the Mohammed bin Rashid Al Maktoum solar park beating Saudi Arabia\u2019s Acwa Power for the bid, the Dubai Media Office reports. [&hellip;]","og_url":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/","og_site_name":"Climate","article_published_time":"2023-08-14T01:00:49+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park","datePublished":"2023-08-14T01:00:49+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/"},"wordCount":527,"publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1","keywords":["EnterpriseClimate","Masdar","renewables","SOLAR","solar energy","UAE"],"articleSection":["SOLAR"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/","url":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/","name":"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park - Climate","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1","datePublished":"2023-08-14T01:00:49+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/climate\/2023\/08\/14\/masdar-snaps-up-bid-to-build-1-8-gw-sixth-phase-of-uaes-al-maktoum-solar-park\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/climate\/"},{"@type":"ListItem","position":2,"name":"Masdar snaps up bid to build 1.8 GW sixth phase of UAE\u2019s Al Maktoum solar park"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/climate\/#website","url":"https:\/\/enterpriseam.com\/climate\/","name":"Climate","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/climate\/#organization","name":"Climate","url":"https:\/\/enterpriseam.com\/climate\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/25470.svg","contentUrl":"https:\/\/ent.news\/internal\/25470.svg","caption":"Climate"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2021\/2\/2059.jpg?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/pgVl2y-kxt","_links":{"self":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/78955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/comments?post=78955"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/78955\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/issue\/78950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media\/78956"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media?parent=78955"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/categories?post=78955"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/tags?post=78955"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/brand?post=78955"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=78955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}