{"id":74749,"date":"2022-11-10T02:18:23","date_gmt":"2022-11-10T02:18:23","guid":{"rendered":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/"},"modified":"2022-11-10T02:18:23","modified_gmt":"2022-11-10T02:18:23","slug":"international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt","status":"publish","type":"post","link":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/","title":{"rendered":"International consortium inks agreement for 3 GW wind farm in Egypt"},"content":{"rendered":"<p><a class=\"content-anchor\" id=\"tldr-story-04\"><\/a> <strong>Another mega wind farm in Egypt:<\/strong> Egyptian contracting firm Orascom Construction\u2019s (OC) consortium with France\u2019s Engie and Japan\u2019s Toyota Tsusho has signed up to build a 3 GW wind farm, just days after <a href=\"https:\/\/enterprise.press\/stories\/2022\/11\/01\/oc-breaks-ground-on-ras-ghareb-wind-farm-suez-cement-adds-more-solar-to-its-energy-mix-85774\/\">breaking ground<\/a> on their 500 MW wind project in Ras Ghareb, according to an <a href=\"https:\/\/ent.news\/2022\/11\/OC-Consortium-Signs-MOU-to-Develop-3GW-Wind-Farm.pdf\">OC statement (pdf)<\/a>. The consortium signed an MoU for the wind farm with Egyptian energy authorities on the sidelines of COP, with the country\u2019s Prime Minister Moustafa Madbouly attending the signing ceremony. There are no details on the location or timeline for the project.<\/p>\n<p><strong>The details:<\/strong> OC is responsible for construction and will take an unspecified equity stake in the wind farm, which will be set up under a build, own, operate (BOO) framework. This will be the OC consortium\u2019s third local wind farm. Its Ras Ghareb project should go live in 2025, and it completed a 262.5 MW wind farm, also in Ras Ghareb, <a href=\"https:\/\/enterprise.press\/stories\/2019\/02\/24\/oc-consortium-to-complete-250-mw-wind-farm-in-ras-gharib-two-months-ahead-of-schedule\/\">in 2019<\/a>.<\/p>\n<p><strong>Wind is one of the front runners at COP:<\/strong> The project brings the total new wind-power generation capacity Egypt has locked down <a href=\"https:\/\/enterprise.news\/climate\/en\/news\/story\/952ee209-52e7-435e-860b-caf16ba6251b\">in recent days to 28 GW<\/a>. That\u2019s nearly half of the country\u2019s current installed capacity, which at the end of 2021 stood at 59.5 GW. It is also <a href=\"https:\/\/www.meed.com\/egypt-eyes-10bn-renewables-to-replace-thermal-plants\">more than 8x<\/a> greater than the country\u2019s total renewable-energy generation capacity, which was 3.4 GW at the end of last year. The new projects include two separate 10 GW wind farms that are set to be two of the world\u2019s largest: One from our friends at Infinity Power and Hassan Allam Utilities together with long-time partner Masdar; and <a href=\"https:\/\/enterprise.press\/stories\/2022\/11\/02\/acwa-unit-looks-to-build-worlds-second-largest-wind-farm-in-egypt-85890\/\">the other<\/a> from Saudi renewable energy developer Acwa Power.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Another mega wind farm in Egypt: Egyptian contracting firm Orascom Construction\u2019s (OC) consortium with France\u2019s Engie and Japan\u2019s Toyota Tsusho has signed up to build a 3 GW wind farm, just days after breaking ground on their 500 MW wind project in Ras Ghareb, according to an OC statement (pdf). The consortium signed an MoU [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":74750,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"newspack_ads_suppress_ads":false,"newspack_popups_has_disabled_popups":false,"newspack_sponsor_sponsorship_scope":"","newspack_sponsor_native_byline_display":"inherit","newspack_sponsor_native_category_display":"inherit","newspack_sponsor_underwriter_style":"inherit","newspack_sponsor_underwriter_placement":"inherit","ep_exclude_from_search":false,"_primary_brand":0,"newspack_featured_image_position":"","newspack_post_subtitle":"","newspack_article_summary_title":"Overview:","newspack_article_summary":"","newspack_hide_updated_date":false,"newspack_show_updated_date":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[48],"tags":[40,11,493,88,47,46],"brand":[],"newspack_spnsrs_tax":[],"class_list":["post-74749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-wind","tag-egypt","tag-enterpriseclimate","tag-orascom-construction","tag-renewables","tag-wind","tag-wind-energy","wpautop","entry"],"acf":{"mongo_id":"39e55e8c-4fad-48bd-bd4e-2a5d4f2960d1","is_powered_by":true,"story_type":"1","photo_url":"https:\/\/ent.news\/2022\/11\/284.jpg","photo_position":"above","related_issue":[74743],"teaser":"","voice_url":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.1 (Yoast SEO v27.1.1) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>International consortium inks agreement for 3 GW wind farm in Egypt - Climate<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"International consortium inks agreement for 3 GW wind farm in Egypt\" \/>\n<meta property=\"og:description\" content=\"Another mega wind farm in Egypt: Egyptian contracting firm Orascom Construction\u2019s (OC) consortium with France\u2019s Engie and Japan\u2019s Toyota Tsusho has signed up to build a 3 GW wind farm, just days after breaking ground on their 500 MW wind project in Ras Ghareb, according to an OC statement (pdf). The consortium signed an MoU [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/\" \/>\n<meta property=\"og:site_name\" content=\"Climate\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-10T02:18:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1\" \/>\n<meta name=\"author\" content=\"enterpriseam admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"enterpriseam admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/\"},\"author\":{\"name\":\"enterpriseam admin\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\"},\"headline\":\"International consortium inks agreement for 3 GW wind farm in Egypt\",\"datePublished\":\"2022-11-10T02:18:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/\"},\"wordCount\":280,\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1\",\"keywords\":[\"Egypt\",\"EnterpriseClimate\",\"Orascom Construction\",\"renewables\",\"wind\",\"Wind Energy\"],\"articleSection\":[\"WIND\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/\",\"url\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/\",\"name\":\"International consortium inks agreement for 3 GW wind farm in Egypt - Climate\",\"isPartOf\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1\",\"datePublished\":\"2022-11-10T02:18:23+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/enterpriseam.com\/climate\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"International consortium inks agreement for 3 GW wind farm in Egypt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#website\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"name\":\"Climate\",\"description\":\"The State of the Nation\",\"publisher\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#organization\",\"name\":\"Climate\",\"url\":\"https:\/\/enterpriseam.com\/climate\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/ent.news\/internal\/25470.svg\",\"contentUrl\":\"https:\/\/ent.news\/internal\/25470.svg\",\"caption\":\"Climate\"},\"image\":{\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d\",\"name\":\"enterpriseam admin\",\"sameAs\":[\"http:\/\/enterpriseam.testing.projectsarea.com\"],\"url\":\"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"International consortium inks agreement for 3 GW wind farm in Egypt - Climate","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/","og_locale":"en_US","og_type":"article","og_title":"International consortium inks agreement for 3 GW wind farm in Egypt","og_description":"Another mega wind farm in Egypt: Egyptian contracting firm Orascom Construction\u2019s (OC) consortium with France\u2019s Engie and Japan\u2019s Toyota Tsusho has signed up to build a 3 GW wind farm, just days after breaking ground on their 500 MW wind project in Ras Ghareb, according to an OC statement (pdf). The consortium signed an MoU [&hellip;]","og_url":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/","og_site_name":"Climate","article_published_time":"2022-11-10T02:18:23+00:00","og_image":[{"url":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1","type":"","width":"","height":""}],"author":"enterpriseam admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"enterpriseam admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#article","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/"},"author":{"name":"enterpriseam admin","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d"},"headline":"International consortium inks agreement for 3 GW wind farm in Egypt","datePublished":"2022-11-10T02:18:23+00:00","mainEntityOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/"},"wordCount":280,"publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1","keywords":["Egypt","EnterpriseClimate","Orascom Construction","renewables","wind","Wind Energy"],"articleSection":["WIND"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/","url":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/","name":"International consortium inks agreement for 3 GW wind farm in Egypt - Climate","isPartOf":{"@id":"https:\/\/enterpriseam.com\/climate\/#website"},"primaryImageOfPage":{"@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1","datePublished":"2022-11-10T02:18:23+00:00","breadcrumb":{"@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#primaryimage","url":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1","contentUrl":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1"},{"@type":"BreadcrumbList","@id":"https:\/\/enterpriseam.com\/climate\/2022\/11\/10\/international-consortium-inks-agreement-for-3-gw-wind-farm-in-egypt\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/enterpriseam.com\/climate\/"},{"@type":"ListItem","position":2,"name":"International consortium inks agreement for 3 GW wind farm in Egypt"}]},{"@type":"WebSite","@id":"https:\/\/enterpriseam.com\/climate\/#website","url":"https:\/\/enterpriseam.com\/climate\/","name":"Climate","description":"The State of the Nation","publisher":{"@id":"https:\/\/enterpriseam.com\/climate\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/enterpriseam.com\/climate\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/enterpriseam.com\/climate\/#organization","name":"Climate","url":"https:\/\/enterpriseam.com\/climate\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/","url":"https:\/\/ent.news\/internal\/25470.svg","contentUrl":"https:\/\/ent.news\/internal\/25470.svg","caption":"Climate"},"image":{"@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/enterpriseam.com\/climate\/#\/schema\/person\/ca597032db7e4db868359c123cec256d","name":"enterpriseam admin","sameAs":["http:\/\/enterpriseam.testing.projectsarea.com"],"url":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"}]}},"featured_image_src":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?resize=600%2C400&ssl=1","featured_image_src_square":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?resize=600%2C600&ssl=1","author_info":{"display_name":"enterpriseam admin","author_link":"https:\/\/enterpriseam.com\/climate\/author\/enterpriseam\/"},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ent.news\/2022\/11\/284.jpg?fit=%2C&ssl=1","jetpack_sharing_enabled":true,"jetpack-related-posts":[],"jetpack_shortlink":"https:\/\/wp.me\/pgVl2y-jrD","_links":{"self":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/74749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/comments?post=74749"}],"version-history":[{"count":0,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/posts\/74749\/revisions"}],"acf:post":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/issue\/74743"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media\/74750"}],"wp:attachment":[{"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/media?parent=74749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/categories?post=74749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/tags?post=74749"},{"taxonomy":"brand","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/brand?post=74749"},{"taxonomy":"newspack_spnsrs_tax","embeddable":true,"href":"https:\/\/enterpriseam.com\/climate\/wp-json\/wp\/v2\/newspack_spnsrs_tax?post=74749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}